2008 Assessment of Forestry Road Crossings in the Kispiox River Watershed...
The purpose of the 2008 Kispiox River Watershed, Forestry Road Crossing Assessment Project was to protect fish habitat by identifying stream crossings within the Cullon,... -
Kispiox Watershed Fish Passage Culvert Inspection Assessment for Cullon,...
Kispiox Watershed Fish Passage Culvert Inspection Assessment for Cullon, Ironside, Corral and Clifford Sub-Basins. -
Fish Passage Assessment of Kispiox Forestry Road Stream Crossing
The purpose of this report is to present background information and survey results for fish passage assessments conducted at Kispiox forestry road stream crossings. The Kispiox... -
Watershed Assessment of the Kitseguekla Community Watershed
At the request of Skeena Cellulose Inc. Carnaby Division, a Watershed Assessment of the Kits Creek watershed was conducted by Freshwater Resources of Smithers, B.C. The... -
Bulkley River Watershed Overwintering Study Reports
This dataset contains all of the overwintering studies in the Bulkley River watershed. This over-wintering monitoring was conducted to provide background data to assist Habitat... -
Upper Bulkley River Fish Fence/Coho Assessment Fence Program Reports
Annual reports for Upper Bulkley River assessments at the Bulkley River Coho Assessment Fence approximately 6km upstream from the Upper Bulkley Morice confluence. Information... -
Reconnaissance (1:20,000) Fish and Fish Habitat Stream Inventory Re-Sampling...
The main objectives of the 1:20,000 fish and fish habitat reconnaissance level stream inventory project in lower Buck Creek watershed were: to review and summarize historical... -
Juvenile Coho Studies at the Telkwa River Ponds - Telkwa Rearing Ponds
The purpose of these studies is to undertake coho smolt enumeration at Km 1010 and 1011 in the Bulkley River, to compare mark-and-recapture population estimates, and to measure... -
Chicago Creek Hatchery Operations Final Reports
These final reports include a project background, project objectives and accomplishments, project activity, results, and future objectives. -
Reconnaissance (1:20,000) Fish and Fish Habitat Inventory Shovel/Maxan...
The objective of this project was to conduct a Reconnaissance (1:20,000) Fish and Fish Habitat Inventory in several drainages within the Babine Lake watershed group. This is a... -
Bulkley TSA Critical Stream Reach Inventory
Triton Environmental Consultants Ltd. (Triton) was retained by the Ministry of Forests and Range (MOFR) to conduct a critical fish-stream reach inventory within the Bulkley... -
A Decision-Making Framework to Identify "Temperature-Sensitive Streams" for...
The object of this thesis is to provide results from analysis to aid forest managers to define acceptable levels of impact for a particular stream and evaluate the likelihood... -
2000-2001 Interim Watershed Restoration Plan - Lake District
There is no description for this dataset
-
Watershed Restoration Project (WRP) Completion Reports - Forest Renewal BC (FRBC)
These reports summarizes the projects carried out as part of the FRBC funded Watershed Restoration Program/Project (WRP) -
Morice Watershed-Based Fish Sustainability Plan
The purpose of the Morice Watershed-based Fish Sustainability Plan is to sustain robust fish populations and fully functioning aquatic ecosystems in the Morice River watershed.... -
Interim Interior Watershed Restoration Plans
The following document is a compendium of the five Interim Interior Watershed Restoration Plans completed to date. -
Toboggan Creek Stream Rehabilitation and Silvern Lakes Road Deactivation
The objectives of this project are to re-establish and maintain the original stream channel, protect fish habitat, maintain fish passage and maintain 4wheel drive recreational... -
Bushman Creek In-stream Maintenance Works
This document provides insight on the Bushman Creek In-Stream Maintenance Works, targeting the maintenance and repair of approximately 350m of channel extending upstream from... -
Hatchery Creek Spawning Habitat Improvement Project
This report summarizes a habitat improvement project which was funded by the Pacific Salmon Commission and is intended to be a record of the project to provide a better... -
Beaver Dam Mitigation and Nuisance Beaver Control
In 2023, the Gitanyow Fisheries Authority (GFA) was contracted by the BC Ministry of Forests to manage beaver dam mitigation and control in the Kitwanga and Nass watersheds. The...