Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field... -
Technical Data Report: Conceptual Freshwater Fish Habitat Compensation Plan...
The objectives of this plan are three-fold. First, the plan describes the methods that will be used to quantify the amount of compensatory fish habitat needed to offset the... -
Juvenile Coho Salmon and Steelhead Assessment of Lower Toboggan Creek,...
Juvenile sampling and habitat assessment was conducted in the lower three kilometers of Toboggan Creek from September to November, 1998. The lower two kilometers of the stream... -
Fish Passage Assessment of Highway 16 and CN Rail in the Bulkley Watershed
This Bulkley fish passage assessment is part of a larger regional effort to improve fish passage limited by highways and secondary roads throughout the Skeena Basin. The purpose... -
Aquatic Stream Inventory: Operational Stream Inventory in the Morrison IRM Unit 1996
The overall purpose of this project was to conduct fisheries inventory in operational areas identified by Houston Forest Products in the Morrison Integrated Resource Management... -
Suskwa River Steelhead Trout: The 1977 Inventory, Creel Survey and Life...
The 1977 aspect of the Suskwa River project began in July and continued until freeze-up in November. Fish were sampled either with "Gees" traps or by angling. The inventory crew...