Morice Watershed-Based Fish Sustainability Plan
The purpose of the Morice Watershed-based Fish Sustainability Plan is to sustain robust fish populations and fully functioning aquatic ecosystems in the Morice River watershed.... -
Toboggan Creek Stream Rehabilitation and Silvern Lakes Road Deactivation
The objectives of this project are to re-establish and maintain the original stream channel, protect fish habitat, maintain fish passage and maintain 4wheel drive recreational... -
Upper Williams Creek Spawning Channel
This dataset contains reports related to the channel excavation of the Upper Williams Spawning Channel project. The project is part of a series of initiatives within the Lakelse... -
Bulkley River Bank Stabilization and Riparian Rehabilitation - Telkwa
The project was conducted on a privately owned site (Wittwer Ranch) around 4km upstream from Telkwa, northern BC. The goal of the Bulkley River Bank Stabilization and Riparian... -
Waterfall Creek Enhancement Project 2000
A restoration/rehabilitation plan was developed that recommended and initiated measures to address community concerns by supplying survey and design for rehabilitation work,... -
Spring Creek Project Dairy Street Landslide Rehabilitation
Spring Creek is a tributary to the Kalum River, close to Terrace. After a small landslide at the west end of Dairy Street in Terrace was discovered, which posed a potential... -
Scully Creek Off-channel Habitat & Flow Augmentation Project (N06-H11)
This report discusses the Scully Creek Off-channel Habitat and Flow Augmentation Project (N06-H11), which was initiated to improve sockeye spawning conditions that have been... -
As-built Report of Fish Passage Improvement Projects within the Wet'suwet'en...
This report describes the fish passage restoration projects completed at three high-priority sites on the upper Bulkley River within Wet'suwet'en First Nation territory in 2017.... -
As-built Report of Aquatic Restoration and On-farm Cattle Management...
This report describes the as-built aquatic habitat restoration projects undertaken at four high-priority sites along the upper Bulkley River within Wet'suwet'en First Nation... -
As-built Report of Aquatic Restoration and On-farm Cattle Management...
This report describes the aquatic habitat restoration construction completed at the lower Craker Road site and repairs completed to two instream structures within the upper... -
Tributary Sockeye Escapement Monitoring and Mapping
The dataset contains reports providing mapping of stream habitats and spawn locations, along with escapement data for the Lakelse tributaries. The reports and outlined... -
Annual Compendium of Aquatic Rehabilitation Projects for the Watershed...
B.C.'s Watershed Restoration Program (WRP) was implemented under the Province's Forest Renewal Plan in mid-1994 in response to a historical lack of mechanisms for ensuring... -
Mid Skeena Watershed Restoration Effectiveness Monitoring
In 2006, Gitksan Watershed Authorities was retained by the Pacific Salmon Commission to conduct an effectiveness monitoring in three Mid Skeena sub-basins: the Kispiox,...