Annual Compendium of Aquatic Rehabilitation Projects for the Watershed...
B.C.'s Watershed Restoration Program (WRP) was implemented under the Province's Forest Renewal Plan in mid-1994 in response to a historical lack of mechanisms for ensuring... -
Maxan Watershed Stream Habitat Restoration and Enhancement Level 2 Design...
AGRA Earth & Environmental Limited (AEE) was retained by Dz'ilh K'Az Kwa Development Corporation (DKK) to design stream habitat restoration and enhancement measures in the... -
Bulkley River Bank Stabilization and Riparian Rehabilitation - Telkwa
The project was conducted on a privately owned site (Wittwer Ranch) around 4km upstream from Telkwa, northern BC. The goal of the Bulkley River Bank Stabilization and Riparian... -
Kitwanga River Coho Habitat Enhancement 2005
The Kitwanga River drainage is a tributary of the Skeena River and is located approximately 90 kilometres northwest of Terrace, B.C. The Upper Kitwanga River has excellent... -
Lakelse Lake Sockeye Rehabilitation Program: Scully Creek Off-channel...
This report discusses the Scully Creek Off-channel Habitat and Flow Augmentation Project, which was initiated to improve sockeye spawning conditions that have been negatively... -
Waterfall Creek Enhancement Project 2000
A restoration/rehabilitation plan was developed that recommended and initiated measures to address community concerns by supplying survey and design for rehabilitation work,... -
Toboggan Creek Stream Rehabilitation and Silvern Lakes Road Deactivation
The objectives of this project are to re-establish and maintain the original stream channel, protect fish habitat, maintain fish passage and maintain 4wheel drive recreational... -
As-built Report of Fish Passage Improvement Projects within the Wet'suwet'en...
This report describes the fish passage restoration projects completed at three high-priority sites on the upper Bulkley River within Wet'suwet'en First Nation territory in 2017.... -
As-built Report of Aquatic Restoration and On-farm Cattle Management...
This report describes the as-built aquatic habitat restoration projects undertaken at four high-priority sites along the upper Bulkley River within Wet'suwet'en First Nation... -
As-built Report of Aquatic Restoration and On-farm Cattle Management...
This report describes the aquatic habitat restoration construction completed at the lower Craker Road site and repairs completed to two instream structures within the upper... -
Spring Creek Project Dairy Street Landslide Rehabilitation
Spring Creek is a tributary to the Kalum River, close to Terrace. After a small landslide at the west end of Dairy Street in Terrace was discovered, which posed a potential... -
Mid Skeena Watershed Restoration Effectiveness Monitoring
In 2006, Gitksan Watershed Authorities was retained by the Pacific Salmon Commission to conduct an effectiveness monitoring in three Mid Skeena sub-basins: the Kispiox,... -
The Mission Creek Stream Survey Report Janurary 2000
This stream survey provides information on stream hydrology. The information that was collected provides details on channel length, width, depths as well as information on... -
Stewardship Project Registry
The Stewardship Project Registry Atlas captures records of completed projects (as far back as the mid 1990s) for many of the funding organizations in the Pacific Region. The... -
An Investigation of the Condition of Kathlyn Lake, with Suggestions for...
As early as 1970, and continuing into the year 1973, concerned citizens of the Smithers area brought to the attention of the Water Resources Services the fact that nuisance weed... -
Detailed Fish Habitat, Riparian and Channel Assessment for Select Central...
Land use activities have had a significant impact on many of the tributaries within the central Bulkley River watershed. Preliminary air photo analysis has indicated that high... -
Bulkley River Bank Stabilization and Riparian Rehabilitation (Telkwa, BC)
The goal of the Bulkley River Bank Stabilization and Riparian Rehabilitation Project was to re-establish a stand of native riparian zone plants immediately adjacent to the... -
Watershed Assessment of the Kitseguekla Community Watershed
At the request of Skeena Cellulose Inc. Carnaby Division, a Watershed Assessment of the Kits Creek watershed was conducted by Freshwater Resources of Smithers, B.C. The... -
Water Quality Assessment and Objectives for Toboggan Creek and Tributaries:...
The purpose of this report is to assess the water quality and aquatic ecosystem data gathered to date and to recommend water quality objectives specific to the Toboggan Creek... -
Water Management at Equity Silver Mines Ltd.
Predominantly all wastes, both tailing and blasted rock, contain pyrite and are classified acid generating. Acid generation occurs within waste rock fills around the property...