Toboggan Creek Coho Smolt Enumerations
The primary focus of the "Toboggan Creek Smolt Project" is to estimate the number of wild coho (0. kisutch) smolts leaving Toboggan Creek. Initiated in the spring of 1995, the study aimed to estimate wild coho populations of Toboggan Creek by comparison... -
Skeena Environmental Effects Monitoring (EEM) Pre-Design Reference Document
This document provides a basis for the design phase of an environmental effects monitoring program (EEM) for Repap's pulp and paper mill, Skeena Cellulose Inc., located near Prince Rupert, British Columbia. The pre-design document is essentially a "State of... -
Morrison Copper/Gold Project Assessment Report
This Assessment Report considers the proposed Morrison Copper/Gold Mine Project’s potential to cause significant adverse environmental, economic, social, heritage, and health effects. It identifies measures to prevent or reduce adverse effects, and sets out... -
Juvenile Coho Salmon and Steelhead Assessment of Lower Toboggan Creek, Septem...
Juvenile sampling and habitat assessment was conducted in the lower three kilometers of Toboggan Creek from September to November, 1998. The lower two kilometers of the stream is of lower habitat quality (higher gradient, greater velocity, little cover)... -
Fish Passage Assessment of Highway 16 and CN Rail in the Bulkley Watershed
This Bulkley fish passage assessment is part of a larger regional effort to improve fish passage limited by highways and secondary roads throughout the Skeena Basin. The purpose of this report is to present background information and survey results for fish... -
1982 Investigations of Adult Coho Salmon in the Telkwa River
A study to provide more detailed information on the timing and distribution of adult coho salmon spawning in the Telkwa River Basin was conducted between September and December 1982. Five tributary streams and the mainstem Telkwa River were examined for the... -
Suskwa River Steelhead Trout: The 1977 Inventory, Creel Survey and Life Histo...
The 1977 aspect of the Suskwa River project began in July and continued until freeze-up in November. Fish were sampled either with "Gees" traps or by angling. The inventory crew switched to a casual creel survey and an adult steelhead tagging program during...