28 datasets found

Categories and Collections: land use and development Licenses: Other (Not Open) Tags: 2010s industrial activities

Filter Results
  • Northwest Cumulative Effects Case Study

    The Northwest pilot has investigated a range of cumulative effect related topics as well as developed methods to assess impacts of industrial development on a selection of values at a broad spatial scale. The goal of the pilot was to improve the consistency...
  • Impacts of LNG Development to Salmon Habitat on Lelu Island and Flora Bank

    This report outlines the unaddressed issues that remain after the mitigation proposal presented by Petronas for a suspension bridge over Flora Bank.
  • An Investigation into the Feasibility of Modifying Derelict Dams to Improve S...

    Skeena Fisheries Commission (SFC), in partnership with the Lax Kw’alaams Fisheries Program conducted a feasibility assessment to determine whether salmon productivity in the Kloiya River and Rainbow Lake watersheds could be improved by modifying a series of...
  • Wet'suwet'en Title & Rights and Coastal GasLink

    The Office of the Wet'suwet'en (OW) presents this submission to British Columbia Environmental Assessment Agency (BC EAO). This submission is a component of the Wet'suwet'en response in respect of the proposed Coastal GasLink pipeline project within...
  • Wet'suwet'en Submission to the Canadian Environmental Assessment Agency - Pac...

    This submission from the Office of the Wet'suwet'en (OW) to the Canadian Environmental Assessment Agency (CEAA) is a response to the CEAA report regarding the proposed Pacific NorthWest LNG project near LeLu Island.
  • The Flooded Tailings Impoundment at the Equity Silver Mine

    The Equity Silver Mine operated between 1980 and 1994, producing silver, gold, and copper from three open pits and a small underground operation. Mine components include a flooded tailings impoundment constructed from till and waste and quarried rock. This...
  • Tenas Project: Project Description

    Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed metallurgical coal product at about 0.750 million saleable tonnes per year to be used in...
  • Technical Data Report: Conceptual Freshwater Fish Habitat Compensation Plan E...

    The objectives of this plan are three-fold. First, the plan describes the methods that will be used to quantify the amount of compensatory fish habitat needed to offset the harmful alteration, disruption, or destruction (HADD) resulting from the Project....
  • Surface Freshwater Quality Technical Data Report: Proposed Aurora LNG Project

    This technical data report presents the results of the surface freshwater acidification and eutrophication assessment including a description of field surveys, methods, and baseline data describing existing conditions.
  • Skeena Cumulative Effects Assessment

    This Skeena Cumulative Effects Assessment (SCEA) documents the analysis of the cumulative effects of individual and multiple physical, biological and chemical stressors associated with human activities on three key species: eulachon, Chinook salmon and...
  • Review of 2010 financial security at Equity Silver Mine

    The Equity Silver Mine operated between 1980 and 1994, producing silver, gold, and copper from three open pits and a small underground operation. Future liability is important at the site due to the environmental risk and high cost of treating acid rock...
  • Rail Evacuation Maps

    Railway evacuation maps for diesel, methanol, and propane referenced from the North American 2016 Emergency Response Guidebook
  • Project Description Prince Rupert LNG

    Prince Rupert LNG Limited (PRLNG) proposes to develop a Liquefied Natural Gas (LNG) facility on Ridley Island at the Port of Prince Rupert British Columbia (BC). The name of the project is Prince Rupert LNG (the Project). This document describes the project.
  • Prince Rupert Marine Risk Assessment

    This study provides Prince Rupert Port Authority (PRPA) with an assessment of the risks due to future operations of LNG and oil tankers in the Prince Rupert gateway, to compare these risks with similar existing gateways in North America, and to identify...
  • Potential Effects of an Oil Pipeline Rupture on Reach 2 of Morice River: A Su...

    This submission focuses on a portion of the pipeline route that is located adjacent to Morice River, 70 km south of Smithers. It examines the implications of a pipeline rupture and subsequent clean-up efforts to river processes, fish and fish habitat, and...
  • Pacific Northern Gas Looping Project: Project Description

    This report summarizes the Pacific Northern Gas Looping Project by describing the project, areas of federal interest, the resource and material requirements, indigenous engagement, public engagement, project setting, and potential project effects.
  • Pacific Future Energy Refinery: Project Description

    This project description for the Pacific Future Energy refinery presents the purpose of the project, its location, and its building procedures. It also discusses how water will be used and treated, and the potential impacts on the surrounding environment....
  • Northwest Transmission Line: Bell-Irving Route Study

    Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information collected as well as an evaluation of potential project effects on VECs along the...
  • Natural Resource Stewardship Monitoring and Assessment Report for the Wet'suw...

    Natural Resource Stewardship Monitoring and Assessment Reports are a summary of existing resource value monitoring and assessment information for a given geographic area. Data in this report has been arranged into the following categories: fish and water,...
  • Marine Sediment and Water Quality Technical Data Report: Proposed Aurora LNG ...

    To facilitate safe manoeuvring and berthing of vessels, capital dredging of marine sediment and rock will be required at two berth areas, located south of Frederick Point, and at the Materials Off-Loading Facility. The data presented herein will be used to...
You can also access this registry using the API (see API Docs).