7 datasets found

Groups: vegetation/ecology habitat Licenses: Other (Not Open) Formats: PDF Tags: coho rainbow trout

Filter Results
  • Tenas Project: Project Description

    Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed metallurgical coal product at about 0.750 million saleable tonnes per year to be used in...
  • Telkwa Coal Project: Application for a Project Approval Certificate

    The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments proposed for British Columbia. The purpose of the Application is to provide an...
  • Technical Data Report: Conceptual Freshwater Fish Habitat Compensation Plan E...

    The objectives of this plan are three-fold. First, the plan describes the methods that will be used to quantify the amount of compensatory fish habitat needed to offset the harmful alteration, disruption, or destruction (HADD) resulting from the Project....
  • Preliminary Survey of Juvenile Salmonid Rearing Habitat Summer 1976: Upper Ki...

    A preliminary study of the juvenile salmonid populations of the Upper Kalum River and its tributaries was conducted during August 1976. The objectives of the study were: to locate and describe the preferred rearing habitat of juvenile salmonids in the Kalum...
  • Pacific Future Energy Refinery: Project Description

    This project description for the Pacific Future Energy refinery presents the purpose of the project, its location, and its building procedures. It also discusses how water will be used and treated, and the potential impacts on the surrounding environment....
  • Morice River Stream Survey August 1975

    A survey investigating the fish, and especially the steelhead values, of the small feeder creeks of the Morice River was conducted from August 6-15, 1975. The biological data included fish species present, invertebrates, in-stream and bank vegetation,...
  • Kitimat - Summit Lake Pipeline Looping Project: Assessment Report

    The purpose of this Assessment Report is to: describe the Project; summarize the process for the review of the Application; report on the adequacy of the Proponent’s distribution of information during the Application Review; report on whether the...
You can also access this registry using the API (see API Docs).