-
Conserving Morice Watershed Fish Populations and their Habitat: Stage II Biop...
This report addresses Stage II of the Watershed-based Fish Sustainability Planning process by developing the biophysical profile of the Morice Watershed. Stage II produced a biophysical and sociopolitical profile of each of the priority watershed planning... -
Annual Compendium of Aquatic Rehabilitation Projects for the Watershed Restor...
B.C.'s Watershed Restoration Program (WRP) was implemented under the Province's Forest Renewal Plan in mid-1994 in response to a historical lack of mechanisms for ensuring rehabilitation of logging-impacted hill slopes, riparian areas, and streams. -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed metallurgical coal product at about 0.750 million saleable tonnes per year to be used in... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments proposed for British Columbia. The purpose of the Application is to provide an... -
Technical Data Report: Conceptual Freshwater Fish Habitat Compensation Plan E...
The objectives of this plan are three-fold. First, the plan describes the methods that will be used to quantify the amount of compensatory fish habitat needed to offset the harmful alteration, disruption, or destruction (HADD) resulting from the Project.... -
Preliminary Survey of Juvenile Salmonid Rearing Habitat Summer 1976: Upper Ki...
A preliminary study of the juvenile salmonid populations of the Upper Kalum River and its tributaries was conducted during August 1976. The objectives of the study were: to locate and describe the preferred rearing habitat of juvenile salmonids in the Kalum... -
Pacific Future Energy Refinery: Project Description
This project description for the Pacific Future Energy refinery presents the purpose of the project, its location, and its building procedures. It also discusses how water will be used and treated, and the potential impacts on the surrounding environment.... -
Northwest Coast Traditional Salmon Fisheries System of Resource Utilization
This thesis presents evidence that traditional systems of salmon production were generally coincident with seasonal migrations of adult salmon returning from marine environments to fresh water spawning grounds. This characteristic movement of salmon biomass... -
1982 Investigations of Adult Coho Salmon in the Telkwa River
A study to provide more detailed information on the timing and distribution of adult coho salmon spawning in the Telkwa River Basin was conducted between September and December 1982. Five tributary streams and the mainstem Telkwa River were examined for the...