Northwest Transmission Line: Bell-Irving Route Study

Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information collected as well as an evaluation of potential project effects on VECs along the Bell-Irving route. The purpose of this supplemental report was to evaluate the project to the level that the other segments were evaluated in the EAC application. Where necessary, the EAC Application sections are referred to.