-
Range of Variation in Structural Attributes of Harvested Stands in the...
This report provides information on structure remaining following managed disturbance (timber harvesting) within the Babine River Watershed as a basis for direct comparisons... -
Pacific Trail Pipelines Application Volume II: Baseline Studies
These baseline studies cover the following topics with regards to the impacts of the Pacific Trail Pipeline: acid rock drainage and metal leaching, acoustic environment, air... -
Our Place at the Table: First Nations in the B.C. Fishery
This report lays out solutions and recommendations aimed at bringing a high degree of certainty to aboriginal and non-aboriginal interests alike while ensuring the conservation... -
North Coast Land and Resource Management Plan
The North Coast Land and Resource Management Plan (LRMP) covers approximately 1.7 million hectares of land. The LRMP represents the consensus reached by the participants of the... -
Morrison Copper/Gold Application and Supporting Studies
This dataset contains elements of the Morrison Copper/Gold mine application which are relevant to salmon in the Skeena watershed. The document itself and its appendices... -
Morice-Nanika Sockeye Recovery Plan
The Morice-Nanika Sockeye Recovery Plan process provides a framework for aboriginal, government, industry, and public groups to work together towards stock recovery. -
Morice Water Management Area - Multi-Year Operational Plan
This operational plan is the initial product of a partnership between the Office of the Wet’suwet’en and the Province of British Columbia to develop a water monitoring and... -
Morice Land and Resource Management Plan
The Morice LRMP provides policy direction on the management of land and resources in the Morice LRMP area, and provides direction for the establishment of landscape level legal... -
Monitoring Land Use and Human Activities and Assessing their Potential...
As a species of special concern in the Babine Watershed, grizzly bears are given specific consideration in the development of the Bulkley Land and Resource Management Plan and... -
Monitoring Land Use Planning to Maintain Grizzly Bears Project 2009-3
This report aims to support monitoring for the implementation and effectiveness of land use planning for achieving management and conservation goals to maintain grizzly bears... -
Management Direction Statement for Kitson Island Marine Provincial Park
Management direction statements provide strategic management direction for protected areas that do not have an approved management plan. A portion of this park is subject to the... -
Lower Skeena Fish Passage: Closed Bottom Structure Assessments 2009
This project included the planning, data collection and analysis phases of closed bottom structure assessments for the purpose of identifying fish passage barriers in need of... -
Landsat 7 Composite Tiled Image (Years 2000 to 2002)
A Landsat 7 composite image of the Skeena Watershed and surrounding area years 2000 - 2002. The composite image is tiled into four images - NW, NE, SW, and SE. The image is... -
Landsat 7 Composite Image of Skeena Watershed (2000-2002)
Landsat 7 Composite Image Cut to the Skeena Watershed Boundary. Capture dates 2000 to 2002. Projection is EPSG 3005. -
Landsat 7 Collection 1 Tier 1 Scenes
Landsat 7 Satellite Images from 2000 - 2002. Data is provided by WRS path and row number. Data files follow the new USGS Landsat categories and are classified as Collection 1... -
Land Use Designation Maps for Babine River Watershed
A series of maps representing various land use plan designations. -
Lakelse Lake Draft Management Plan
The lake management planning process devises methods “to preserve and protect the quality and health of the Lakelse watershed”. This management plan marks the end of the first... -
Kitwanga Sockeye Recovery Plan Backgrounder
Kitwanga sockeye abundance has been in decline for the last five decades. Constraints to sockeye production are not well understood; it is thought they stem from a combination... -
Kitimat to Summit Lake Natural Gas Pipeline Looping Project: Conceptual...
Construction of the Kitimat to Summit Lake Natural Gas Pipeline Looping Project (the KSL Project) will enable delivery of natural gas from the Kitimat Liquefied Natural Gas... -
Kitimat - Summit Lake Pipeline Looping Project: Assessment Report
The purpose of this Assessment Report is to: describe the Project; summarize the process for the review of the Application; report on the adequacy of the Proponent’s...