-
Tenas Project 2017-2018 Baseline Report Draft
This consolidated baseline report aims to provide information on field programs and their respective field summaries for the the 2017 to spring 2018 programs of the Tenas Project. -
Superport Development Preliminary Environmental Effect Assessment
A preliminary environmental effects assessment relating to the potential port sites identified in the Port Development Study by Wright Engineers Limited for the National... -
Summary Report for Toboggan Creek Stream Rehabilitation and Silvern Lakes Roa...
The objectives of this project are to re-establish and maintain the original stream channel, protect fish habitat, maintain fish passage and maintain 4wheel drive recreational... -
Skeena Fish Passage Culvert Inspection (FPCI) Surveys
In 2005, the Skeena Fisheries Commission was retained by the Pacific Salmon Commission to conduct a Fish Passage and Culvert Inspection (FPCI) on all non-bridged stream... -
Skeena Delta Sedimentation, British Columbia
Sediment samples were collected from the sea floor off the delta front, from the lower reaches of the Skeena River channels, and from small beaches and basins in the vicinity of... -
Skeena Cumulative Effects Assessment
This Skeena Cumulative Effects Assessment (SCEA) documents the analysis of the cumulative effects of individual and multiple physical, biological and chemical stressors... -
Salmon Science as Related to Proposed Development in the Skeena River Estuary
A collaborative research team of academic and First Nation scientists has been studying the Skeena River estuary ecosystem and its juvenile salmon. After 4 years, 100 boat days,... -
Ridley Island Port Construction Activities - 1982: Background and Environment...
This report contains the findings of an EPS program carried out in the summer of 1982 to monitor the effects on the receiving environment of port construction activities... -
Ridley Island Export Logistics Park Project Environmental Effects Evaluation
Environmental effects evaluation for the Ridley Island Export Logistics Park Project. The project is an export logistics platform that is intended to enhance the Port of Prince... -
Review of the Environmental and Socio-Economic Impacts of Marine Pollution in...
This report attempts to provide a preliminary review of the some of the possible impacts, monitoring, and mitigation measures for many of the pollution issues including sewage... -
Results of the Stream Crossing Quality Index Survey for the Nichyeskwa Waters...
Results of the Stream Crossing Quality Index (SCQI) Survey for the Nichyeskwa Watershed, Skeena Stikine Forest District. This report presents the results of the SCQI survey... -
Results of the Stream Crossing Quality Index (SCQI) Survey for the Upper Babi...
This report present the results of the Stream Crossing Quality Index (SCQI) survey conducted in the Upper Babine River Corridor during the week of July 4th, 2006. -
Rail Evacuation Maps
Railway evacuation maps for diesel, methanol, and propane referenced from the North American 2016 Emergency Response Guidebook -
Project Description Prince Rupert LNG
Prince Rupert LNG Limited (PRLNG) proposes to develop a Liquefied Natural Gas (LNG) facility on Ridley Island at the Port of Prince Rupert British Columbia (BC). The name of the... -
Prince Rupert Marine Risk Assessment
This study provides Prince Rupert Port Authority (PRPA) with an assessment of the risks due to future operations of LNG and oil tankers in the Prince Rupert gateway, to compare... -
Prince Rupert Landfill Leachate: Impact on Hays Creek
This report documents the leachate and creek water chemistry findings and remove all doubt that the creek is adversely affected. -
Prince Rupert Area Coastal Fish Habitat Bibliography
A bibliography of existing coastal information describing habitat and biota. -
Ongoing Legacy of Metal Mines on Babine Lake
An assessment of discharge regulation, aquatic monitoring, and aquatic impacts related to Bell and Granisle Mines. -
Northwest Transmission Line EAO Inspection Records
Environmental Assessment Office inspection records for the Northwest Transmission Line project. The Environmental Assessment Office (Chris PARKS, Compliance Officer) completed... -
Morrison Copper/Gold Mine Project Third Party Review of Groundwater, Water Qu...
EAO wishes to retain an independent, expert, third party consultant to undertake a technical review of the hydrogeology, hydrology, water balance, water quality, and related...