-
Water Quality and Biological Studies in the Marine Environment Near the...
Studies in Porpoise Channel, Porpoise Harbour and Wainwright Basin during 1986 encompassed physical, chemical, and biological assessments of the local environment. These... -
Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field... -
Water Quality in British Columbia Objectives Attainment
The setting of water quality objectives in priority basins in British Columbia began in 1982. By the end of 2002, the Ministry of Water, Land, and Air Protection had set water... -
Upper Bulkley Floodplain Habitat: Modifications, Physical Barriers, and...
The Bulkley River upstream of the Morice River has some of the most intense public and private land use in the Skeena watershed. The purpose of this assessment was to document... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments... -
Telkwa Coal Project Appendix 8: Geotechnical and Hydrogeological...
Piteau Engineering Ltd. (PEL) was retained by Manalta Coal Ltd. (Manalta) to conduct a series of geotechnical and hydrogeological investigations in support of the proposed... -
Telkwa Coal Project Appendix 6: Baseline Data, Surface Water, and Groundwater 1994
Samples were collected for the first time from a watercourse on the proposed project site on the north side of the Telkwa, and from sites on the Telkwa River and Goathorn Creek... -
Telkwa Coal Project Appendix 12: Aquatic Resource Assessment 1985
Studies were undertaken during 1984 to evaluate aquatic resources in the Telkwa Project study area in west-central British Columbia. Stream periphyton, invertebrates, and fish... -
Skeena Environmental Effects Monitoring (EEM) Pre-Design Reference Document
This document provides a basis for the design phase of an environmental effects monitoring program (EEM) for Repap's pulp and paper mill, Skeena Cellulose Inc., located near... -
Skeena Cellulose Inc. Environmental Effects Monitoring (EEM) Cycle Three...
The purpose of this design document is to summarize and update mill process information and results from previous cycles and other studies, and to provide a rationale for the... -
Reconnaissance Inventory of West Julian Holland Lake
The report presents the results of a reconnaissance level “Fish and Fish Habitat Inventory” of West Julian Holland Lake 460-6006-508-005-283-218-502-01 performed to the current... -
Pacific Trail Pipelines Project: Volume 1 Report - Application for...
This Application for an Environmental Assessment Certificate for the KSL Project has been prepared pursuant to Section 16(1) of the B.C. Environmental Assessment Act. The... -
Pacific Trail Pipelines Application Volume II: Baseline Studies
These baseline studies cover the following topics with regards to the impacts of the Pacific Trail Pipeline: acid rock drainage and metal leaching, acoustic environment, air... -
Pacific Future Energy Refinery: Project Description
This project description for the Pacific Future Energy refinery presents the purpose of the project, its location, and its building procedures. It also discusses how water will... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information... -
Natural Resource Stewardship Monitoring and Assessment Report for the...
Natural Resource Stewardship Monitoring and Assessment Reports are a summary of existing resource value monitoring and assessment information for a given geographic area. Data... -
Morrison Copper/Gold Project Fish Habitat Compensation Plan
Pacific Brooker Minerals is proposing to develop the Morrison Copper/Gold Project on the east side of Morrison Lake, north of Babine Lake. The project will require the... -
Morrison Copper/Gold Project Assessment Report
This Assessment Report considers the proposed Morrison Copper/Gold Mine Project’s potential to cause significant adverse environmental, economic, social, heritage, and health... -
Morrison Copper/Gold Application and Supporting Studies
This dataset contains elements of the Morrison Copper/Gold mine application which are relevant to salmon in the Skeena watershed. The document itself and its appendices...