-
Zymoetz (Copper) River Culvert Replacement and Outlet Channel (Site 77)
This project encompassed a culvert replacement to improve fish passage. Overwintering habitat by juvenile coho was isolated from the river by two perched culverts in the road.... -
Copper River Watershed Restoration Program: Copper River 3Km Off-channel Site
One project aim was the improvement of fish habitat. The site is located adjacent to the Copper River forest services road, between km 2 and 3, approximately 10 km east of... -
Copper River Watershed Restoration Program: Site 9 Berm Removal & 3km Side Channel
Site 9 is a 300 m long groundwater channel that was excavated in 1998 within a flood channel to the Copper River, adjacent to 3 km along the Copper Forest Service Road. This... -
Kitwanga Sockeye Salmon Spawning Habitat Improvement Initiative
Since 1999, the Gitanyow Fisheries Authority has been intensively studying the Kitwanga Watershed in an effort to understand the decline of the Kitwanga sockeye stock.... -
Upper Williams Creek Spawning Channel
This dataset contains reports related to the channel excavation of the Upper Williams Spawning Channel project. The project is part of a series of initiatives within the Lakelse... -
Hatchery Creek Spawning Habitat Improvement Project
This report summarizes a habitat improvement project which was funded by the Pacific Salmon Commission and is intended to be a record of the project to provide a better... -
Tributary Sockeye Escapement Monitoring and Mapping
The dataset contains reports providing mapping of stream habitats and spawn locations, along with escapement data for the Lakelse tributaries. The reports and outlined... -
Conserving Lakelse Fish and their Habitat
Lakelse Watershed backgrounder - This backgrounder has been updated for the use of the Lakelse Lake Sockeye Recovery Plan (LLSRP) planning table (related to the Lakelse Lake... -
Recovering Lakelse Lake Sockeye Salmon
This document embodies the Lakelse Lake Sockeye Rehabilitation Program Plan. It showcases the result of the process of reviewing available information, evaluating options, and... -
Scully Creek Off-channel Habitat & Flow Augmentation Project (N06-H11)
This report discusses the Scully Creek Off-channel Habitat and Flow Augmentation Project (N06-H11), which was initiated to improve sockeye spawning conditions that have been... -
Lakelse Lake Sockeye Rehabilitation Program:
In 2005 and 2006, DFO worked with multiple stakeholders to develop the Lakelse Sockeye Recovery Plan in an attempt to halt the estimated 92% decline in this stock that was... -
Skeena/Bulkley/Morice Watershed Fish Passage Restoration Planning - Bii Wenii Kwa
This dataset focuses on fish passage restoration planning in the Bii Wenii Kwa. The documents were extracted from larger reports on fish passage restoration planning, which can... -
Bii Wenii Kwa/Owen Creek Watershed Status Evaluation report
This report provides important baseline information for the study area in 2014 and is intended to convey WSEP results and recommendations to land managers, including... -
McDowell Creek Culvert Replacement
This project focused on the replacement of a defunct culvert, that blocked fish access to 450 metres of important off-channel rearing habitat, approximately 130 metres upstream... -
Bulkley River and Morice River Watershed Groups Fish Passage Restoration Planning
In April of 2020, the Society for Ecosystem Restoration Northern British Columbia (SERNbc) undertook an initiative to plan and conduct fish passage restoration planning... -
Robert Hatch Creek Bridge Removal
This project focused on the removal of an old, collapsed wooden bridge where the creek passed through the Hatch Creek Ranch. Removal of this barrier and the restoration of... -
Cross Creek Culvert Replacement
This project focused on the replacement of two culverts close to Babine Lake, which became impassable to fish due to debris and low flow, especially at the time of year that... -
Annual Compendium of Aquatic Rehabilitation Projects for the Watershed...
B.C.'s Watershed Restoration Program (WRP) was implemented under the Province's Forest Renewal Plan in mid-1994 in response to a historical lack of mechanisms for ensuring... -
SKT Annual Review
Annual reviews of the Skeena Knowledge Trust showcasing our efforts, activities and new datasets. -
Copper River Watershed Restoration Program: Debris Catcher Construction
Goals of the project included the improvement of fish habitat and educational purposes such as showing debris catchers as alternatives to traditional riprap bank protection for...