-
Water Monitoring in British Columbia: Scanning the Data Landscape Public Report
The overall goal of this scan is to inform a shared vision for water monitoring and reporting in BC. This scan collected information on surface and groundwater quality and... -
Morrison Copper/Gold Mine Project Third Party Review of Groundwater, Water...
EAO wishes to retain an independent, expert, third party consultant to undertake a technical review of the hydrogeology, hydrology, water balance, water quality, and related... -
Telkwa Coal Project Aquatic Resource Assessment (1985)
This report is the result of studies undertaken in 1984 that evaluated aquatic resources in the Telkwa Project study area in west-central British Columbia. Stream periphyton,... -
Floodplain Stability, Morice River, Between Owen Creek and Thautil River
A geomorphological study of the Morice River floodplain, between the confluence of the Thautil River and Fenton Creek (Reach 2), was undertaken at the request of the Forest...