-
The Flooded Tailings Impoundment at the Equity Silver Mine
The Equity Silver Mine operated between 1980 and 1994, producing silver, gold, and copper from three open pits and a small underground operation. Mine components include a... -
Goldcorp Canada Ltd - Equity Division Environmental Report
This report has been prepared in support of the Ministry of Environment permit P.E.4475 and the Ministry of EMNG reclamation permit M-114. This report focuses on the... -
Fish Monitoring Studies in Buck, Foxy and Crow Creeks and Goosly Lake
These reports present the results of the 2012 and 2017 fish monitoring programs conducted in the vicinity of Equity Mine near Houston BC. -
Assessment of Benthic Invertebrate and Juvenile Fish Populations in Foxy and...
Field studies assessing fish and benthic invertebrate populations in Foxy Creek, a small stream located in north central British Columbia near Houston, were undertaken in late... -
2012 Sustainability Report Closed Sites in Honduras, Mexico, the United...
The focus of this report is on Goldcorp’s one closed site in Honduras (San Martin), one closed site in Mexico (Nukay in Guerrero), four closed sites in the United States (Dee... -
Acid Generation Modelling - Equity Silver Waste Rock Dumps
Equity was comfortable with the Technical Committee reports but wanted to confirm the data by having a site specific ARD (Acid Rock Drainage) model developed for their site. The...