Reconnaissance Level Fish and Fish Habitat Inventories in the Bulkley T.S.A.
These reports summarize the reconnaissance level fish and fish habitat inventories for various locations along the Bulkley River. Sensitive habitats and barriers are discussed,... -
Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field... -
Toboggan Creek Watershed Restoration Project
These reports present the information found during the Toboggan Creek Watershed Restoration Project. This project assessed the historical background of the watershed, including... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments... -
Technical Data Report: Conceptual Freshwater Fish Habitat Compensation Plan...
The objectives of this plan are three-fold. First, the plan describes the methods that will be used to quantify the amount of compensatory fish habitat needed to offset the... -
Stream Inventory: Fenton Creek and Adjacent Tributaries 1997
This survey provides an assessment of fish presence/absence in Fenton Creek and its adjacent tributaries. It identifies stream gradients and reasons for obstructed fish passage,... -
Results of the Kloiya River Resistivity Counter
The objective of this study was to quantify juvenile steelhead abundance and estimate values for habitat capacity thresholds. In 2005, the Ministry of Environment (MoE) began... -
Reconnaissance Inventory of West Julian Holland Lake
The report presents the results of a reconnaissance level “Fish and Fish Habitat Inventory” of West Julian Holland Lake 460-6006-508-005-283-218-502-01 performed to the current... -
Reconnaissance (1:20,000) Fish and Fish Habitat Stream Inventory Re-Sampling...
The main objectives of the 1:20,000 fish and fish habitat reconnaissance level stream inventory project in lower Buck Creek watershed were: to review and summarize historical... -
Reconnaissance (1:20,000) Fish and Fish Habitat Inventory of Tributaries to...
The main objectives of the watershed reconnaissance level stream inventory project in the tributaries to the Skeena River and in White Creek (Lakelse watershed, Skeena drainage)... -
Reconnaissance (1:20,000) Fish and Fish Habitat Inventory of Tributaries to...
Portions of the Fulton River watershed, and a series of inlet streams to the west shore of Babine Lake between the Fulton River and Newman Island were surveyed in July 1997,... -
Preliminary Survey of Juvenile Salmonid Rearing Habitat Summer 1976: Upper...
A preliminary study of the juvenile salmonid populations of the Upper Kalum River and its tributaries was conducted during August 1976. The objectives of the study were: to... -
Pacific Future Energy Refinery: Project Description
This project description for the Pacific Future Energy refinery presents the purpose of the project, its location, and its building procedures. It also discusses how water will... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information... -
Mid-Bulkley Overview Fish and Fish Habitat Assessment for Watershed Restoration
An overview fish and fish habitat assessment in the sub-basins of the Mid-Bulkley Watershed that: determines what fish species are at risk to the impacts of poor land-use... -
Kitimat - Summit Lake (KSL) Pipeline Looping Project: Project Description
This project description has been prepared for submission to the B.C. Environmental Assessment Office (EAO) in accordance with the requirements of the B.C. Environmental... -
Juvenile Coho Salmon and Steelhead Assessment of Lower Toboggan Creek,...
Juvenile sampling and habitat assessment was conducted in the lower three kilometers of Toboggan Creek from September to November, 1998. The lower two kilometers of the stream... -
Fisheries Background Studies Morrison Watershed 2004
This report summarizes background fisheries information available for the Morrison Watershed. It focuses on Morrison Creek, Morrison Lake, and its inlet tributaries, with the... -
Fish Passage Assessment of Highway 16 and CN Rail in the Bulkley Watershed
This Bulkley fish passage assessment is part of a larger regional effort to improve fish passage limited by highways and secondary roads throughout the Skeena Basin. The purpose...