Watershed Assessment of the Kitseguekla Community Watershed
At the request of Skeena Cellulose Inc. Carnaby Division, a Watershed Assessment of the Kits Creek watershed was conducted by Freshwater Resources of Smithers, B.C. The... -
Water Quality Assessment and Objectives for Toboggan Creek and Tributaries:...
The purpose of this report is to assess the water quality and aquatic ecosystem data gathered to date and to recommend water quality objectives specific to the Toboggan Creek... -
Upper Bulkley Floodplain Habitat: Modifications, Physical Barriers, and...
The Bulkley River upstream of the Morice River has some of the most intense public and private land use in the Skeena watershed. The purpose of this assessment was to document... -
Sediment Source Mapping, Detailed Channel Assessment, and Reconnaissance...
Sediment source mapping, detailed channel assessment, and reconnaissance sediment budget for Williams Creek for the period 1949 to 2001. This study has two components: (1)... -
Review of the Hydrology, Geomorphology, Ecology & Management of the Skeena...
Review of the hydrology, geomorphology, ecology and management of the Skeena River floodplain. This review of the natural and human history of the floodplain of the lower Skeena... -
Refining habitat indicators for Strategy 2 of the Wild Salmon Policy:...
This report provides results from Step 3, Identifying Metrics and Benchmarks for habitat indicators being considered by DFO for Strategy 2 of the Wild Salmon Policy. -
Pacific Trail Pipelines Project: Volume 1 Report - Application for...
This Application for an Environmental Assessment Certificate for the KSL Project has been prepared pursuant to Section 16(1) of the B.C. Environmental Assessment Act. The... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information... -
Morrison Copper/Gold Project Assessment Report
This Assessment Report considers the proposed Morrison Copper/Gold Mine Project’s potential to cause significant adverse environmental, economic, social, heritage, and health... -
Interim Assessment Protocol for Aquatic Ecosystems in British Columbia:...
The Aquatic Ecosystems assessment protocol currently describes the derivation of a core set of watershed indicators that can be calculated consistently across the province using... -
Hydrolic and Geomorphic Considerations for Silvicultural Investments on the...
Hydrologic and geomorphic considerations for silvicultural investments on the lower Skeena River floodplain. This report evaluates four inter-related components essential for... -
Davidson Project: Application for Environmental Assessment Certificate
This underground mining project will be located in the Bulkley-Nechako Regional District and in the traditional territory of the Wet'suwet'en people. Included in this dataset... -
Dahlie Creek Salmonid Overwintering and Water Quality Studies: Interim Report
This document contains a detailed fish habitat, riparian, and channel assessment of Dahlie Creek. Low channel complexity, removal of riparian vegetation, culvert obstructions to... -
Canada's Policy for Conservation of Wild Pacific Salmon: Stream, Lake, and...
This report documents the methodology used by the Department of Fisheries and Oceans (DFO) to identify potential Strategy 2 habitat indicators, metrics, and benchmarks (as well... -
Assessment of Stream Protection Practices in the Interior of the Prince...
Assessment of stream protection practices in the interior of the Prince Rupert Forest Region. Stream protection measures used in forestry operations in the interior of the...