Davidson Project Meteorology and Hydrology Baseline Report 2006-2008
This meteorology and hydrology baseline report summarizes results from 2006, 2007, and 2008 from the Davidson meteorology station and for 6 hydrometric stations established for... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments... -
Telkwa Coal Project Appendix 6: Baseline Data, Surface Water, and Groundwater...
Samples were collected for the first time from a watercourse on the proposed project site on the north side of the Telkwa, and from sites on the Telkwa River and Goathorn Creek... -
Northwest Water Tool
The Northwest Water Tool was developed for the Ministry of Forests, Lands and Natural Resource Operations to provide guidance on water availability across northwest BC and to... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information... -
Davidson Project: Application for Environmental Assessment Certificate
This underground mining project will be located in the Bulkley-Nechako Regional District and in the traditional territory of the Wet'suwet'en people. Included in this dataset... -
Attainment of Water Quality Objectives for the Smithers Lakes (Kathlyn, Seymo...
Designated water uses for Smithers Lakes included drinking, recreation, aquatic life, irrigation, livestock and industrial use. Water quality objectives were set in 1985 to...