3 datasets found

Tags: risk assessment monitoring groundwater

Filter Results
  • Tenas Project: Project Description

    Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed metallurgical coal product at about 0.750 million saleable tonnes per year to be used in...
  • Site Specific Risk Assessments of Two Former Copper Concentrate Shed Sites Ne...

    In summary, the risk assessments identified COCs in soil that may have potential to cause adverse effects, especially to soil invertebrates and plants, although this is principally a theoretical risk owing to important habitat limitations in the most...
  • Morrison Copper/Gold Application and Supporting Studies

    This dataset contains elements of the Morrison Copper/Gold mine application which are relevant to salmon in the Skeena watershed. The document itself and its appendices constitute Pacific Booker Minerals' application for a certificate under the British...
You can also access this registry using the API (see API Docs).