-
Northwest Cumulative Effects Case Study
The Northwest pilot has investigated a range of cumulative effect related topics as well as developed methods to assess impacts of industrial development on a selection of values at a broad spatial scale. The goal of the pilot was to improve the consistency... -
Conserving Morice Watershed Fish Populations and their Habitat: Stage II Biop...
This report addresses Stage II of the Watershed-based Fish Sustainability Planning process by developing the biophysical profile of the Morice Watershed. Stage II produced a biophysical and sociopolitical profile of each of the priority watershed planning... -
BWMT Project Reports
This dataset contains eighteen reports initiated by the Babine Watershed Monitoring Trust between 2003 and 2013. -
Assessment of Sockeye Fry Passage at the Babine River Adult Salmon Counting F...
Skeena Fisheries Commission (SFC) conducted a study to investigate whether the Babine River Counting Fence prevented sockeye fry that drifted downstream of the structure from migrating back upstream to suitable rearing habitat in June 2015. An engineering... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed metallurgical coal product at about 0.750 million saleable tonnes per year to be used in... -
Skeena-Nass Area Water Quality Assessment and Objectives: Technical Appendix
This report assess present water quality of the mainstem Bulkley and Morice Rivers, to predict future water quality, and to recommend water uses that should be protected, and to recommend provisional water quality objectives to protect those uses. -
Salmonid Resource Analysis for the Fort St. James Land and Resource Managemen...
This document presents the available salmonid resource information as well as the status of development activity and physiographic conditions within the Skeena River basin portion of the Fort St. James Land and Resource Management Plan (LRMP) area. This... -
Review and Assessment of Water Quality in the Skeena River Watershed, British...
Historical water quality data presented for the Skeena River watershed are divided into nine subsequent sections, corresponding to the nine major watershed reaches. Each section is divided into 6 subsections: hydrology, land use history, water withdrawals,... -
Refining habitat indicators for Strategy 2 of the Wild Salmon Policy: Identif...
This report provides results from Step 3, Identifying Metrics and Benchmarks for habitat indicators being considered by DFO for Strategy 2 of the Wild Salmon Policy. -
Recent Trends in the Catchability of Sockeye Salmon in the Skeena River Gilln...
The Skeena River Salmon Management Committee established the Skeena River gillnet test fishery in 1955. The test fishery is used to monitor sockeye and pink salmon escapement during the management season (June-September). As a secondary function, the test... -
Rebuilding Plan for the Morice Sockeye Recovery Unit
This report by the Wet'suwet'en Nation and Fisheries and Oceans Canada is intended as a framework towards the recovery of sockeye in the Morice Recovery Unit. -
Pacific Salmon Commission Northern Boundary Technical Committee Report: Statu...
This document presents an assessment of the status of coho salmon (Onchorhynchus kisutch) in the Canadian northern boundary areas with emphasis on the Skeena River. The content of this assessment has largely been drawn from published assessments. There are... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information collected as well as an evaluation of potential project effects on VECs along the... -
Ned'u'ten Fisheries Commission 1996/97
The 1996 harvest was unprecedented in a number of ways. It was the first time that all three nations in the Skeena watershed have worked together on such a huge scale. It was the largest harvest undertaken on Babine Lake in modern times in terms of the... -
Morrison Copper/Gold Project Fish Habitat Compensation Plan
Pacific Brooker Minerals is proposing to develop the Morrison Copper/Gold Project on the east side of Morrison Lake, north of Babine Lake. The project will require the construction of a Tailings Storage Facility, including tailings and seepage control dams,... -
Morrison Copper/Gold Project Assessment Report
This Assessment Report considers the proposed Morrison Copper/Gold Mine Project’s potential to cause significant adverse environmental, economic, social, heritage, and health effects. It identifies measures to prevent or reduce adverse effects, and sets out... -
Morice Watershed-Based Fish Sustainability Plan: A Plan to Conserve and Prote...
The purpose of the Morice Watershed-based Fish Sustainability Plan is to sustain robust fish populations and fully functioning aquatic ecosystems in the Morice River watershed. The goals of the plan are to: • Maintain and protect existing fish habitat; •... -
Lakelse Lake Water Quality Assessment and Objectives
This study assesses the water quality of Lakelse Lake. A summary report and detailed technical appendix are included. Report published February 1986. -
Infectious Disease, Shifting Climates, and Opportunistic Predators: Cumulativ...
An overview of the evolutionary and ecological impacts of infectious diseases, shifting climates, and opportunistic predators in wild salmon and suggested ways in which modern technologies can elucidate the microparasites of greatest potential import. -
Canada's Policy for Conservation of Wild Pacific Salmon: Stream, Lake, and Es...
This report documents the methodology used by the Department of Fisheries and Oceans (DFO) to identify potential Strategy 2 habitat indicators, metrics, and benchmarks (as well as possible sampling protocols). The proposed list of indicators presented in...