-
Babine River Steelhead, 1993/94: Population Estimate and Weir Assessment
This steelhead study included a population estimate of the upper Babine River and a trial operation of the Babine River Weir for future enumeration of the upper Babine and Boucher Creek populations. A mark/recapture study was conducted to assess the 1993/94... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments proposed for British Columbia. The purpose of the Application is to provide an... -
Technical Data Report: Conceptual Freshwater Fish Habitat Compensation Plan E...
The objectives of this plan are three-fold. First, the plan describes the methods that will be used to quantify the amount of compensatory fish habitat needed to offset the harmful alteration, disruption, or destruction (HADD) resulting from the Project.... -
Steelhead Migration Behaviour and Timing as Evaluated from Radio Tagging at t...
This study is a continuation of radio telemetry work conducted previously. The purpose of this study was to further refine stock specific run timing for steelhead within the Skeena River watershed. A secondary objective was to obtain migration rate data. -
Skeena Environmental Effects Monitoring (EEM) Pre-Design Reference Document
This document provides a basis for the design phase of an environmental effects monitoring program (EEM) for Repap's pulp and paper mill, Skeena Cellulose Inc., located near Prince Rupert, British Columbia. The pre-design document is essentially a "State of... -
Results of the Upper Sustut River Weir Steelhead Assessment Projects
A floating PVC fish fence was installed into the upper Sustut River annually since 1992, as an indicator of annual upper Sustut River adult steelhead (Oncorhynchus mykiss) abundance. -
Radio Telemetry Studies of Summer Run Steelhead Trout in the Skeena River Dra...
Radio tagging studies were carried out in the Skeena drainage in order to more fully understand the life history of summer run steelhead trout. During the fall of 1978, 24 steelhead were radio tagged on the Morice River, 15 on the Kispiox River, 14 on the... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information collected as well as an evaluation of potential project effects on VECs along the... -
Movement of Radio Tagged Steelhead in the Morice River Determined by Helicopt...
This project is part of the joint Department of Fisheries and Oceans (DFO) and BC Ministry of Environment program to reduce the incidental interception of steelhead bound for the Skeena River by 50%. Monitoring of key Skeena steelhead stocks will be...