The Maxan Lake Multi-Land Use Study: A Summary Review
The objective of the Maxan Lake multi-land use study was to examine the interaction between various forms of land use on an area having multi-use capacity. To this end, various studies were conducted to examine different aspects of this complex subject. The... -
The Flooded Tailings Impoundment at the Equity Silver Mine
The Equity Silver Mine operated between 1980 and 1994, producing silver, gold, and copper from three open pits and a small underground operation. Mine components include a flooded tailings impoundment constructed from till and waste and quarried rock. This... -
Morrison Copper/Gold Project 3rd Party Review Response Report
This report presents the response to the 3rd Party Review of the Environmental Assessment for the Morrison Copper/Gold Project. The 3rd Party Review was requested by the Environmental Assessment Office and was mainly directed towards the hydrogeology, water...