-
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments proposed for British Columbia. The purpose of the Application is to provide an... -
Telkwa Coal Project Appendix 12: Aquatic Resource Assessment 1985
Studies were undertaken during 1984 to evaluate aquatic resources in the Telkwa Project study area in west-central British Columbia. Stream periphyton, invertebrates, and fish populations were assessed in Goathorn and Tenas creeks and the lower Telkwa... -
Reconnaissance Survey of Lakelse Lake
This survey collected information about the fish species that are present in Lakelse Lake, as well as information about the physical characteristics of the lake. This includes aquatic vegetation, terrain features, food species, natural spawning and... -
Reconnaissance Inventory of West Julian Holland Lake
The report presents the results of a reconnaissance level “Fish and Fish Habitat Inventory” of West Julian Holland Lake 460-6006-508-005-283-218-502-01 performed to the current standards provided by the Resources Inventory Committee (RIC). West Julian... -
Reconnaissance (1:20,000) Fish and Fish Habitat Inventory of Tributaries to W...
Portions of the Fulton River watershed, and a series of inlet streams to the west shore of Babine Lake between the Fulton River and Newman Island were surveyed in July 1997, June 1999, July— August 2000, and July — August 2001 to assess fish habitat... -
Reconnaissance (1:20,000) Fish and Fish Habitat Inventory Tributaries in the ...
The objective of this project was to conduct a Reconnaissance (1:20,000) Fish and Fish Habitat Inventory in several watersheds within the Bulkley River (BULK) watershed group. These inventories have a multi-phased approach with six phases required to... -
Reconnaissance (1:20,000) Fish and Fish Habitat Inventory Re-sampling of Pete...
This report summarizes past fish inventory efforts and results in context with data collected during re-sampling to present a comprehensive picture of fish distribution in the upper Peter-Aleck drainage. -
Fisheries Background Studies Morrison Watershed 2004
This report summarizes background fisheries information available for the Morrison Watershed. It focuses on Morrison Creek, Morrison Lake, and its inlet tributaries, with the objective of providing an overview of the fisheries resources of the entire... -
Davidson Project: Application for Environmental Assessment Certificate
This underground mining project will be located in the Bulkley-Nechako Regional District and in the traditional territory of the Wet'suwet'en people. Included in this dataset are the executive summary and elements of chapter six which deal directly with the... -
Aurora LNG Freshwater Fish and Fish Habitat Final Report 2014-2015
The objective of the Freshwater Fish and Fish Habitat Program was to conduct field surveys of streams within and adjacent to the Project area (i.e., location of LNG plant infrastructure and ancillary facilities on Digby Island). This report presents the... -
Aquatic Stream Inventory: Operational Stream Inventory in the Morrison IRM Un...
The overall purpose of this project was to conduct fisheries inventory in operational areas identified by Houston Forest Products in the Morrison Integrated Resource Management Unit (IRM). The objectives were to conduct a literature review of inventory...