Nadina Stream Crossings
These reports summarize the results of field surveys conducted in 2006, 2007, and 2009. The project area is located approximately 300km west of Prince George. All streams are within the Upper Nechako Reservoir, Cheslatta Lake (CHES), Francois Lake (FRAN),... -
Morice Land and Resource Management Plan
The Morice LRMP provides policy direction on the management of land and resources in the Morice LRMP area, and provides direction for the establishment of landscape level legal objectives. There are four main sections to the plan: General Management... -
Kitimat to Summit Lake Natural Gas Pipeline Looping Project: Conceptual Compe...
Construction of the Kitimat to Summit Lake Natural Gas Pipeline Looping Project (the KSL Project) will enable delivery of natural gas from the Kitimat Liquefied Natural Gas (KLNG) facility to the Spectra Energy Transmission BC pipeline facilities located... -
Interim Restoration Plans for Watershed Units within the Morice Forest District
The following report presents the Interim Restoration Plans (IRP) for targeted watershed units (WU) within the Morice Forest District. The layout of this Interim Restoration Plan has been broken down by watershed unit. For each watershed unit, a brief... -
Fish and Fish Habitat Investigations for the Proposed Kitimat-Summit Lake Nat...
The primary objective of the inventory programme was to identify and confirm the locations and fish habitat potential of watercourses along the KSL Project pipeline route, from KP 0 to KP 462.2. Sampling also documented fish presence/absence and habitat... -
Dahlie Creek Salmonid Overwintering and Water Quality Studies: Interim Report
This document contains a detailed fish habitat, riparian, and channel assessment of Dahlie Creek. Low channel complexity, removal of riparian vegetation, culvert obstructions to fish passage, sedimentation, altered flow regime, and channelization were some...