12 datasets found

Formats: PDF Tags: groundwater monitoring

Filter Results
  • Water Monitoring in British Columbia: Scanning the Data Landscape Public Report

    The overall goal of this scan is to inform a shared vision for water monitoring and reporting in BC. This scan collected information on surface and groundwater quality and quantity monitoring and reporting in British Columbia, providing examples of who is...
  • Water Management at Equity Silver Mines Ltd.

    Predominantly all wastes, both tailing and blasted rock, contain pyrite and are classified acid generating. Acid generation occurs within waste rock fills around the property however not within tailing thus far due to sub- aqueous disposal of the product....
  • Tenas Project: Project Description

    Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed metallurgical coal product at about 0.750 million saleable tonnes per year to be used in...
  • Tenas Project 2017-2018 Baseline Report Final

    This consolidated baseline report aims to provide information on field programs and their respective field summaries for the the 2017 to spring 2018 programs of the Tenas Project.
  • Tenas Project 2017-2018 Baseline Report Draft

    This consolidated baseline report aims to provide information on field programs and their respective field summaries for the the 2017 to spring 2018 programs of the Tenas Project.
  • Site Specific Risk Assessments of Two Former Copper Concentrate Shed Sites Ne...

    In summary, the risk assessments identified COCs in soil that may have potential to cause adverse effects, especially to soil invertebrates and plants, although this is principally a theoretical risk owing to important habitat limitations in the most...
  • Sampling of Metals and Aquatic Life in the Bulkley River Adjacent to the Form...

    This study was carried out to monitor the effects, if any, of the former Topley Concentrate Shed Site ("Topley Site") on concentrations of dissolved and total metals and other parameters and on aquatic life in the Bulkley River. The study included three...
  • Proctor Creek Groundwater Channel Coho Assessment

    A groundwater study was conducted from May 15, 2007 to August 07, 2007 on a small groundwater channel (GWC) located on private property near Proctor Road just east of Smithers, B C. For the purpose of this report, this groundwater channel is referred to as...
  • Northwest Transmission Line: Bell-Irving Route Study

    Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information collected as well as an evaluation of potential project effects on VECs along the...
  • Morrison Copper/Gold Project Assessment Report

    This Assessment Report considers the proposed Morrison Copper/Gold Mine Project’s potential to cause significant adverse environmental, economic, social, heritage, and health effects. It identifies measures to prevent or reduce adverse effects, and sets out...
  • Morrison Copper/Gold Application and Supporting Studies

    This dataset contains elements of the Morrison Copper/Gold mine application which are relevant to salmon in the Skeena watershed. The document itself and its appendices constitute Pacific Booker Minerals' application for a certificate under the British...
  • Canada's Policy for Conservation of Wild Pacific Salmon: Stream, Lake, and Es...

    This report documents the methodology used by the Department of Fisheries and Oceans (DFO) to identify potential Strategy 2 habitat indicators, metrics, and benchmarks (as well as possible sampling protocols). The proposed list of indicators presented in...
You can also access this registry using the API (see API Docs).