-
2000-2001 Interim Watershed Restoration Plan - Lake District
There is no description for this dataset
-
Integrated Watershed Restoration Plan West Babine Watershed
There is no description for this dataset
-
Morice Watershed Restoration Project
This datasets contains information and reports connected to the Morice Watershed restoration project, funded through Forest Renewal BC (FRBC). -
Watershed Restoration Project (WRP) Completion Reports - Forest Renewal BC (FRBC)
These reports summarizes the projects carried out as part of the FRBC funded Watershed Restoration Program/Project (WRP) -
Upper Zymoetz (Copper River) WRP Overview Fish and Riparian Assessment
This report summarizes fish and fish habitat values within the Copper River watershed and describes impacts to both the fisheries resource and riparian habitats regulating from... -
Toboggan Creek Watershed Restoration Project
These reports present the information found during the Toboggan Creek Watershed Restoration Project. This project assessed the historical background of the watershed, including... -
Telkwa Watershed: A Forest Hydrology Analysis
This study reviews physical watershed characteristics, historical stream flow, and climatic data relevant to the Telkwa watershed. A simple modelling exercise is done to show... -
Morice Watershed-Based Fish Sustainability Plan
The purpose of the Morice Watershed-based Fish Sustainability Plan is to sustain robust fish populations and fully functioning aquatic ecosystems in the Morice River watershed.... -
Mission Creek Adult Coho Enumeration and Transport Program: 1998 Program Report
A broomstick fence was constructed and installed in early September 1998. Coho capture and counting occurred from early September to November 1, 1998. The purpose of the... -
Maxan Watershed Stream Habitat Restoration Works 1998/99
This report included Habitat Restoration Prescriptions for 12 sites on the Bulkley River, 2 sites on Foxy Creek, and 1 site on lower Maxan Creek. -
Interim Interior Watershed Restoration Plans
The following document is a compendium of the five Interim Interior Watershed Restoration Plans completed to date. -
Toboggan Creek Stream Rehabilitation and Silvern Lakes Road Deactivation
The objectives of this project are to re-establish and maintain the original stream channel, protect fish habitat, maintain fish passage and maintain 4wheel drive recreational... -
Bulkley River Pipeline Crossing - Fish Habitat Assessment
This report informs about the assessment of the aquatic habitat in the area of the proposed pipeline crossing, conducted in 1997. -
Babine Wild Sockeye Habitat Rehabilitation 2016
The primary purpose of the 2016 Babine wild sockeye habitat rehabilitation project was to identify habitat projects that could stop and/or reverse the declines in wild Babine... -
Report on the Preliminary Survey of Steelhead of Skeena River Drainage Systems
This report represents an effort to compile as much information as possible on the distribution, migration, and life history of steelhead in the Skeena system. Reference was... -
Bushman Creek In-stream Maintenance Works
This document provides insight on the Bushman Creek In-Stream Maintenance Works, targeting the maintenance and repair of approximately 350m of channel extending upstream from... -
Hatchery Creek Spawning Habitat Improvement Project
This report summarizes a habitat improvement project which was funded by the Pacific Salmon Commission and is intended to be a record of the project to provide a better... -
Zymoetz (Copper) River Watershed Restoration Program: 16-Km Side Channel (Site 54B)
This dataset focuses on the restoration works conducted at Site 54B, one of the many restoration works conducted along the the Zymoetz (Copper) Rivers in the late 1990s/early... -
Unnamed Kispiox Lake (Bartok Lake) Outlet Spawning Gravel Placement
In 1991, technicians with the Recreational Fisheries Branch undertook a restoration project at an unnamed lake, dubbed Bartok lake, approximately 80 km north of Hazelton. This... -
Beaver Dam Mitigation and Nuisance Beaver Control
In 2023, the Gitanyow Fisheries Authority (GFA) was contracted by the BC Ministry of Forests to manage beaver dam mitigation and control in the Kitwanga and Nass watersheds. The...
