Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments... -
Telkwa Coal Project Appendix 8: Geotechnical and Hydrogeological...
Piteau Engineering Ltd. (PEL) was retained by Manalta Coal Ltd. (Manalta) to conduct a series of geotechnical and hydrogeological investigations in support of the proposed... -
Telkwa Coal Project Appendix 6: Baseline Data, Surface Water, and Groundwater 1994
Samples were collected for the first time from a watercourse on the proposed project site on the north side of the Telkwa, and from sites on the Telkwa River and Goathorn Creek... -
Telkwa Coal Project Appendix 12: Aquatic Resource Assessment 1985
Studies were undertaken during 1984 to evaluate aquatic resources in the Telkwa Project study area in west-central British Columbia. Stream periphyton, invertebrates, and fish... -
Telkwa Coal Project Appendix 2: ARD Potential and Management 1994
This report follows previous studies in 1985 on the coal deposits near Goathorn Creek, and in 1990 and 1991 on the coal deposits north of the Telkwa River. This report discusses... -
Final Project Report Specifications for Manalta Coal Ltd's Proposed Telkwa...
Manalta Coal Ltd. (Manalta), of Alberta, has applied under the Environmental Assessment (EA) Act for a project approval certificate for its proposed Telkwa coal project (see...