4 datasets found

Categories and Collections: land use and development population Tags: chum coho wildlife

Filter Results
  • Northwest Cumulative Effects Case Study

    The Northwest pilot has investigated a range of cumulative effect related topics as well as developed methods to assess impacts of industrial development on a selection of values at a broad spatial scale. The goal of the pilot was to improve the consistency...
  • Tenas Project: Project Description

    Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed metallurgical coal product at about 0.750 million saleable tonnes per year to be used in...
  • Pacific Trail Pipelines Project: Volume 1 Report - Application for Environmen...

    This Application for an Environmental Assessment Certificate for the KSL Project has been prepared pursuant to Section 16(1) of the B.C. Environmental Assessment Act. The Application includes a description of the project, an outline of the Public and First...
  • Kitimat - Summit Lake (KSL) Pipeline Looping Project: Project Description

    This project description has been prepared for submission to the B.C. Environmental Assessment Office (EAO) in accordance with the requirements of the B.C. Environmental Assessment Act. This environmental assessment will consider the potential effects of...
You can also access this registry using the API (see API Docs).