- 
    
      Canadian Technical Report of Fisheries and Aquatic SciencesTechnical reports contain scientific and technical information that contributes to existing knowledge but which is not normally appropriate for primary literature. Technical...
- 
    
      Bulkley River Bank Stabilization and Riparian Rehabilitation (Telkwa, BC)The goal of the Bulkley River Bank Stabilization and Riparian Rehabilitation Project was to re-establish a stand of native riparian zone plants immediately adjacent to the...
- 
    
      Aquatic Resource Baseline Studies Telkwa Coal Project 1997 - Draft 2Aquatic studies were conducted in the vicinity of the Telkwa Coal Project during 1997. These studies included updating baseline information describing the periphyton and benthic...
- 
    
      Analysis of Skeena River Tributaries Downstream from the Proposed Enbridge PipelineThis study's objective was to develop and map metrics that delineate the areas of the Skeena River and its tributaries most vulnerable to potential pipeline spills associated...
- 
    
      Water Monitoring in British Columbia: Scanning the Data Landscape Public ReportThe overall goal of this scan is to inform a shared vision for water monitoring and reporting in BC. This scan collected information on surface and groundwater quality and...
- 
    
      Upper Bulkley River Watershed Stream Surveys Summer 2007A stream assessment study was conducted between July and August 2007 for several creeks in the Bulkley River watershed east of Houston, British Columbia. The study area...
- 
    
      The Morice WFSP-Planning Linkages and Forest Licensee SupportThe objectives of this report are to provide: (1) a summary of the challenges and successes faced in integrating the Morice Watershed-based Fish Sustainability Plan (WFSP)...
- 
    
      The Changing Geography of Salmon Canning in British Columbia 1870-1931A thesis explaining the changing geography of British Columbia's commercial salmon canning industry between 1870 and 1931.
- 
    
      Tenas Project Public Consultation PlanThe Tenas Project Public Consultation Plan aims to capture past and future engagement activities between Telkwa Coal Limited (TCL) and the local community and stakeholders,...
- 
    
      Tenas Project Indigenous Consultation and Engagement PlanThe primary purpose of the Indigenous Consultation and Engagement Plan is to describe the approach, methods and activities TCL is proposing to implement to continue its efforts...
- 
    
      Tenas Project 2017-2018 Baseline Report FinalThis consolidated baseline report aims to provide information on field programs and their respective field summaries for the the 2017 to spring 2018 programs of the Tenas Project.
- 
    
      Tenas Project 2017-2018 Baseline Report DraftThis consolidated baseline report aims to provide information on field programs and their respective field summaries for the the 2017 to spring 2018 programs of the Tenas Project.
- 
    
      Superport Development Preliminary Environmental Effect AssessmentA preliminary environmental effects assessment relating to the potential port sites identified in the Port Development Study by Wright Engineers Limited for the National...
- 
    
      Skeena Fish Passage Culvert Inspection (FPCI) SurveysIn 2005, the Skeena Fisheries Commission was retained by the Pacific Salmon Commission to conduct a Fish Passage and Culvert Inspection (FPCI) on all non-bridged stream...
- 
    
      Skeena Delta Sedimentation, British ColumbiaSediment samples were collected from the sea floor off the delta front, from the lower reaches of the Skeena River channels, and from small beaches and basins in the vicinity of...
- 
    
      Skeena Cumulative Effects AssessmentThis Skeena Cumulative Effects Assessment (SCEA) documents the analysis of the cumulative effects of individual and multiple physical, biological and chemical stressors...
- 
    
      Salmon Science as Related to Proposed Development in the Skeena River EstuaryA collaborative research team of academic and First Nation scientists has been studying the Skeena River estuary ecosystem and its juvenile salmon. After 4 years, 100 boat days,...
- 
    
      Ridley Island Port Construction Activities - 1982: Background and...This report contains the findings of an EPS program carried out in the summer of 1982 to monitor the effects on the receiving environment of port construction activities...
- 
    
      Ridley Island Export Logistics Park Project Environmental Effects EvaluationEnvironmental effects evaluation for the Ridley Island Export Logistics Park Project. The project is an export logistics platform that is intended to enhance the Port of Prince...
- 
    
      Review of the Environmental and Socio-Economic Impacts of Marine Pollution...This report attempts to provide a preliminary review of the some of the possible impacts, monitoring, and mitigation measures for many of the pollution issues including sewage...
 
        