Analysis and Priority Identification of Existing Fish Passage Data: Bulkley R...
For this project, existing fish passage information in the Bulkley River watershed located near Smithers, British Columbia, was reviewed in order to prioritize and rank culverts for further assessment and/or rehabilitation. A detailed review and... -
Detailed Fish Habitat, Riparian and Channel Assessment for Select Central Bul...
Land use activities have had a significant impact on many of the tributaries within the central Bulkley River watershed. Preliminary air photo analysis has indicated that high value fish habitat has been moderately to severely impacted in a large proportion... -
Toboggan Creek Watershed Restoration Project
These reports present the information found during the Toboggan Creek Watershed Restoration Project. This project assessed the historical background of the watershed, including a review of fish, fish habitat, impacts, and water quality. Furthermore, the... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed metallurgical coal product at about 0.750 million saleable tonnes per year to be used in... -
Reconnaissance (1:20,000) Fish and Fish Habitat Stream Inventory Re-Sampling ...
The main objectives of the 1:20,000 fish and fish habitat reconnaissance level stream inventory project in lower Buck Creek watershed were: to review and summarize historical fisheries information for the study area, to describe fish distribution and... -
Pacific Trail Pipelines Project: Volume 1 Report - Application for Environmen...
This Application for an Environmental Assessment Certificate for the KSL Project has been prepared pursuant to Section 16(1) of the B.C. Environmental Assessment Act. The Application includes a description of the project, an outline of the Public and First... -
Pacific Trail Pipelines Application Volume II: Baseline Studies
These baseline studies cover the following topics with regards to the impacts of the Pacific Trail Pipeline: acid rock drainage and metal leaching, acoustic environment, air quality, archaeology, contaminated sites, fish and fish habitats, forestry,... -
Morrison Copper/Gold Project Fish Habitat Compensation Plan
Pacific Brooker Minerals is proposing to develop the Morrison Copper/Gold Project on the east side of Morrison Lake, north of Babine Lake. The project will require the construction of a Tailings Storage Facility, including tailings and seepage control dams,... -
Morrison Copper/Gold Project Assessment Report
This Assessment Report considers the proposed Morrison Copper/Gold Mine Project’s potential to cause significant adverse environmental, economic, social, heritage, and health effects. It identifies measures to prevent or reduce adverse effects, and sets out... -
Morrison Copper/Gold Application and Supporting Studies
This dataset contains elements of the Morrison Copper/Gold mine application which are relevant to salmon in the Skeena watershed. The document itself and its appendices constitute Pacific Booker Minerals' application for a certificate under the British... -
Maxan Watershed Stream Habitat Restoration and Enhancement Level 2 Design Rep...
AGRA Earth & Environmental Limited (AEE) was retained by Dz'ilh K'Az Kwa Development Corporation (DKK) to design stream habitat restoration and enhancement measures in the Maxan watershed. -
Fish Passage Assessment of Highway 16 and CN Rail in the Bulkley Watershed
This Bulkley fish passage assessment is part of a larger regional effort to improve fish passage limited by highways and secondary roads throughout the Skeena Basin. The purpose of this report is to present background information and survey results for fish... -
Davidson Project: Application for Environmental Assessment Certificate
This underground mining project will be located in the Bulkley-Nechako Regional District and in the traditional territory of the Wet'suwet'en people. Included in this dataset are the executive summary and elements of chapter six which deal directly with the... -
Dahlie Creek Salmonid Overwintering and Water Quality Studies: Interim Report
This document contains a detailed fish habitat, riparian, and channel assessment of Dahlie Creek. Low channel complexity, removal of riparian vegetation, culvert obstructions to fish passage, sedimentation, altered flow regime, and channelization were some... -
Toward a Fish Habitat Decision on the Kemano Completion Project: A Discussion...
The Kemano Completion Project is massive. The Aluminum Company of Canada (Alcan) proposes a capital expenditure in excess of $2.2 billion which could increase aluminum production from its present level of 240,000 metric tonnes per year to 582,000 metric...