1st Avenue Culvert Replacements Lakelse Lake
The project focused on the replacement of eleven culverts along 1st Avenue at Lakelse Lake to improve fish passage. -
CN Trestle Bridge Channel Diversion and Revegetation
A failing slope was discovered below CN's Trestle Bridge at 8.8 mile on the CN Kitimat Subdivision, located approx. 10 km south of Terrace, BC. The unnamed creek (referred to as... -
Richfield Creek Riparian Exclusion Fencing and Restoration
Richfield Creek was included in a larger riparian restoration initiative in 2021 through the Morice Water Monitoring Trust (see dataset: Upper Bulkley Riparian Restoration). The... -
Toboggan Creek Stream Rehabilitation and Silvern Lakes Road Deactivation
The objectives of this project are to re-establish and maintain the original stream channel, protect fish habitat, maintain fish passage and maintain 4wheel drive recreational... -
Bulkley/Fulton Watershed Fish Passage Culvert Assessment Program
This study looks at barriers to fish crossings in the Bulkley-Fulton watershed, including forestry roads and poorly situated culverts. Funding was made available to restore fish... -
Mid Skeena Watershed Restoration Effectiveness Monitoring
In 2006, Gitksan Watershed Authorities was retained by the Pacific Salmon Commission to conduct an effectiveness monitoring in three Mid Skeena sub-basins: the Kispiox,... -
Fish Passage Assessment of Kispiox Forestry Road Stream Crossing
The purpose of this report is to present background information and survey results for fish passage assessments conducted at Kispiox forestry road stream crossings. The Kispiox... -
Biophysical, Socio-Economic, and Regional Data and Information (BERDI)
BERDI – a data bank for Biophysical, (Socio)Economic, and Regional Data and Information (pronounced “birdie”) - was created to make data collected by the Canada Energy Regulator... -
2008 Assessment of Forestry Road Crossings in the Kispiox River Watershed...
The purpose of the 2008 Kispiox River Watershed, Forestry Road Crossing Assessment Project was to protect fish habitat by identifying stream crossings within the Cullon,... -
Fish Passage GIS Analysis Version 2 Methodology and Output Data...
The BC Land Based Investment (LBI) fish passage program is focused on remediating stream crossings that impede freshwater fish migration. The most common barrier to fish is... -
Impacts of LNG Development to Salmon Habitat on Lelu Island and Flora Bank
This report outlines the unaddressed issues that remain after the mitigation proposal presented by Petronas for a suspension bridge over Flora Bank. -
Fisheries Problems Associated with the Development of Logging Plans within...
This report has been prepared primarily to describe the fisheries problems associated with a large scale logging operation proposed for the system and to outline certain... -
Federal - Provincial Joint Committee on Tsimpsean Penninsula Port Development 1975
Federal - Provincial Joint Committee on Tsimpsean Penninsula Port Development Prince Rupert Bulk Loading Facility - Phase 1 and 2 Phase 1: Bulk Marine Terminal Sites... -
Environmental and Socio-Economic Effects Report
This report is part of BC Hydro's transmission line from Terrace to Kitimat planning process to identify potential Project effects and proposed mitigation for biophysical or... -
Davidson Project Meteorology and Hydrology Baseline Report 2006-2008
This meteorology and hydrology baseline report summarizes results from 2006, 2007, and 2008 from the Davidson meteorology station and for 6 hydrometric stations established for... -
Canadian Technical Report of Fisheries and Aquatic Sciences
Technical reports contain scientific and technical information that contributes to existing knowledge but which is not normally appropriate for primary literature. Technical... -
Bulkley River Bank Stabilization and Riparian Rehabilitation (Telkwa, BC)
The goal of the Bulkley River Bank Stabilization and Riparian Rehabilitation Project was to re-establish a stand of native riparian zone plants immediately adjacent to the... -
Aquatic Resource Baseline Studies Telkwa Coal Project 1997 - Draft 2
Aquatic studies were conducted in the vicinity of the Telkwa Coal Project during 1997. These studies included updating baseline information describing the periphyton and benthic... -
Analysis of Skeena River Tributaries Downstream from the Proposed Enbridge Pipeline
This study's objective was to develop and map metrics that delineate the areas of the Skeena River and its tributaries most vulnerable to potential pipeline spills associated... -
Water Science Series- Screening Tool for Guiding Short-Term Groundwater Curtailment
This report describes a spreadsheet-based screening tool to support statutory decision makers and regional water managers for guiding groundwater curtailment and data collection...