Ministry of Transportation (MOT) Culverts
A Culvert is a pipe (less than 3m in diameter) or half-round flume used to transport or drain water under or away from the road and/or right of way. Culverts that are greater... -
Provincial Stream Crossing Information System (PSCIS) Remediation Sites
Points where a barrier to fish passage has been rectified or remediated. This is the third phase in the process and can only follow after (1) an assessment has been performed on... -
Provincial Stream Crossing Information System (PSCIS) Design Proposal Sites
Points where a fish passage assessment has been performed on a stream crossing structure and found to be a failure. Design points have been identified as a priority for... -
Provincial Stream Crossing Information System (PSCIS) Habitat Confirmation Sites
Points where an evaluation of the fish habitat up and downstream of a road crossing have been carried out. Phase 2 of 4 in the Fish Passage Workflow, Habitat Confirmations are... -
Provincial Obstacles to Fish Passage
The Provincial Obstacles to Fish Passage theme presents records of all known obstacles to fish passage from several fisheries datasets including the Fisheries Information... -
Fisheries Problems Associated with the Development of Logging Plans within the Morice River Drainage System
This report has been prepared primarily to describe the fisheries problems associated with a large scale logging operation proposed for the system and to outline certain... -
Mid-Bulkley Watershed Restoration Project: Level 1 Assessment Roads, Hillslopes and Gullies
This report is the initial survey of the impacted areas within the Mid-Bulkley Watershed and denotes the nature of the impact from past timber harvesting and road building... -
Fish Passage Assessment of Kispiox Forestry Road Stream Crossing
The purpose of this report is to present background information and survey results for fish passage assessments conducted at Kispiox forestry road stream crossings. The Kispiox... -
Project Description Prince Rupert LNG
Prince Rupert LNG Limited (PRLNG) proposes to develop a Liquefied Natural Gas (LNG) facility on Ridley Island at the Port of Prince Rupert British Columbia (BC). The name of the... -
Environmental and Socio-Economic Effects Report
This report is part of BC Hydro's transmission line from Terrace to Kitimat planning process to identify potential Project effects and proposed mitigation for biophysical or... -
Water Monitoring in British Columbia: Scanning the Data Landscape Public Report
The overall goal of this scan is to inform a shared vision for water monitoring and reporting in BC. This scan collected information on surface and groundwater quality and... -
British Columbia Environmental Assessment Act and Regulations
British Columbia’s Environmental Assessment Act requires that certain large-scale project proposals undergo an environmental assessment and obtain an environmental assessment... -
Morrison Mine Re-Consideration and Comments of Pacific Booker Minerals on the Mount Polly Tailings Storage Facility Breach
Comments from the Gitanyow Hereditary Chiefs on the Morrison copper/gold mine proposal. -
Comments from Skeena Fisheries Commission Re: Pacific Booker Minerals' Review Response Report
This report from the Skeena Fisheries Commission addresses the shortfalls in the Pacific Booker Minerals' Review Response Report from a fisheries perspective. -
Summary Report for Toboggan Creek Stream Rehabilitation and Silvern Lakes Road Deactivation
The objectives of this project are to re-establish and maintain the original stream channel, protect fish habitat, maintain fish passage and maintain 4wheel drive recreational... -
Davidson Project: Update of MODFLOW Model
This document details an updated groundwater model for the Davidson EA. Key differences between this version of the model and the previous version are a change in the model... -
Aquatic Stream Inventory: Operational Stream Inventory in the Morrison IRM Unit 1996
The overall purpose of this project was to conduct fisheries inventory in operational areas identified by Houston Forest Products in the Morrison Integrated Resource Management... -
Davidson Project Meteorology and Hydrology Baseline Report 2006-2008
This meteorology and hydrology baseline report summarizes results from 2006, 2007, and 2008 from the Davidson meteorology station and for 6 hydrometric stations established for... -
Morrison Copper/Gold Mine Project Third Party Review of Groundwater, Water Quality and Fisheries Effects Assessment
EAO wishes to retain an independent, expert, third party consultant to undertake a technical review of the hydrogeology, hydrology, water balance, water quality, and related... -
Bulkley River Project: Fabrication and Delivery of Structural Steel for Adult Fence Structure
This document contains diagrams for fish fence models, such as guide frames, walkway panels, fry screen structures, and more.