-
Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field... -
Annual Compendium of Aquatic Rehabilitation Projects for the Watershed Restor...
B.C.'s Watershed Restoration Program (WRP) was implemented under the Province's Forest Renewal Plan in mid-1994 in response to a historical lack of mechanisms for ensuring... -
Wet'suwet'en Submission to the Canadian Environmental Assessment Agency - Pac...
This submission from the Office of the Wet'suwet'en (OW) to the Canadian Environmental Assessment Agency (CEAA) is a response to the CEAA report regarding the proposed Pacific... -
Toboggan Creek Watershed Restoration Project
These reports present the information found during the Toboggan Creek Watershed Restoration Project. This project assessed the historical background of the watershed, including... -
Stream Inventory: Fenton Creek and Adjacent Tributaries 1997
This survey provides an assessment of fish presence/absence in Fenton Creek and its adjacent tributaries. It identifies stream gradients and reasons for obstructed fish passage,... -
Reconnaissance (1:20,000) Fish and Fish Habitat Stream Inventory Re-Sampling ...
The main objectives of the 1:20,000 fish and fish habitat reconnaissance level stream inventory project in lower Buck Creek watershed were: to review and summarize historical... -
Reconnaissance (1:20,000) Fish and Fish Habitat Inventory of Tributaries to t...
The main objectives of the watershed reconnaissance level stream inventory project in the tributaries to the Skeena River and in White Creek (Lakelse watershed, Skeena drainage)... -
Reconnaissance (1:20,000) Fish and Fish Habitat Inventory of Tributaries to W...
Portions of the Fulton River watershed, and a series of inlet streams to the west shore of Babine Lake between the Fulton River and Newman Island were surveyed in July 1997,... -
Reconnaissance (1:20,000) Fish and Fish Habitat Inventory of Selected Inlet S...
In conjunction with extensive historical information, ten of the 129 stream reaches in the study areas (Sub-basins IV, and V) and one lake in Sub-basin IV were sampled during... -
Reconnaissance (1:20,000) Fish and Fish Habitat Inventory at Three Sub-basins...
The Morrison Creek watershed is the fourth largest drainage in the Babine Lake watershed group. Morrison Creek drains into the Morrison Arm of Babine Lake approximately 28 km... -
Reconnaissance (1:20,000) Fish and Fish Habitat Inventory Tributaries in the ...
The objective of this project was to conduct a Reconnaissance (1:20,000) Fish and Fish Habitat Inventory in several watersheds within the Bulkley River (BULK) watershed group.... -
Fisheries Background Studies Morrison Watershed 2004
This report summarizes background fisheries information available for the Morrison Watershed. It focuses on Morrison Creek, Morrison Lake, and its inlet tributaries, with the... -
Fish Passage Assessment of Highway 16 and CN Rail in the Bulkley Watershed
This Bulkley fish passage assessment is part of a larger regional effort to improve fish passage limited by highways and secondary roads throughout the Skeena Basin. The purpose... -
Fish Habitat Inventory & Information Program: Stream Summary Catalogue
This catalogue contains a summary of information on fish and fish habitats for 83 streams in the DFO Subdistrict 4D, Smithers, Volume 2 (Bulkley). The catalogue is organized as... -
Effects of Beaver on Juvenile Coho Salmon Habitat in Kispiox River Tributaries
The purpose of this study was to collect data to determine how beaver dams might affect coho populations in tributaries of the Kispiox River, and to provide a review of the... -
Copper Creek (Q.C.I.) Steelhead Trout: A Report on the Effect of Non Random R...
The prime purpose for this study was to determine if the number of steelhead kelts caught in a tidal gill net sockeye salmon fishery could be reduced. Subsequently, the... -
Chicago Creek Hatchery Operations Final Reports
These final reports include a project background, project objectives and accomplishments, project activity, results, and future objectives. -
British Columbia Fish Passage Program
The project objectives for Maxan creek were to remove the Strimbold Bridge that is impacting fish habitat and likely a barrier to fish passage at some flows, and may pose an... -
Buck Creek Juvenile Salmon Trapping Programs
Juvenile coho, chinook, and rainbow trout/steelhead were sampled for the second and third consecutive years in Buck Creek using a rotary screw trap RST. The RST was sampled... -
Aurora LNG Freshwater Fish and Fish Habitat Final Report 2014-2015
The objective of the Freshwater Fish and Fish Habitat Program was to conduct field surveys of streams within and adjacent to the Project area (i.e., location of LNG plant...