Water Quality in British Columbia Objectives Attainment
The setting of water quality objectives in priority basins in British Columbia began in 1982. By the end of 2002, the Ministry of Water, Land, and Air Protection had set water... -
Water Monitoring in British Columbia: Scanning the Data Landscape Public Report
The overall goal of this scan is to inform a shared vision for water monitoring and reporting in BC. This scan collected information on surface and groundwater quality and... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed... -
Telkwa Coal Project Appendix 6: Baseline Data, Surface Water, and Groundwater...
Samples were collected for the first time from a watercourse on the proposed project site on the north side of the Telkwa, and from sites on the Telkwa River and Goathorn Creek... -
Skeena-Nass Area Water Quality Assessment and Objectives: Technical Appendix
This report assess present water quality of the mainstem Bulkley and Morice Rivers, to predict future water quality, and to recommend water uses that should be protected, and to... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information... -
Morrison Copper/Gold Project Assessment Report
This Assessment Report considers the proposed Morrison Copper/Gold Mine Project’s potential to cause significant adverse environmental, economic, social, heritage, and health... -
Morice Water Management Area - Multi-Year Operational Plan
This operational plan is the initial product of a partnership between the Office of the Wet’suwet’en and the Province of British Columbia to develop a water monitoring and... -
Lakelse Lake Water Quality Assessment and Objectives
This study assesses the water quality of Lakelse Lake. A summary report and detailed technical appendix are included. Report published February 1986. -
Drinking Water Source Quality Monitoring 2002-2003: Bulkley Valley Surface Wa...
This document presents results of the B.C. Ministry of Environment (MoE, formerly Water, Land and Air Protection, WLAP) Skeena Region’s 2002-03 drinking water source quality... -
Davidson Project: Application for Environmental Assessment Certificate
This underground mining project will be located in the Bulkley-Nechako Regional District and in the traditional territory of the Wet'suwet'en people. Included in this dataset... -
BC Environmental Monitoring System Results
The Environmental Monitoring System (EMS) test results as .csv files available for download. Results include physical, chemical and biological analyses of samples taken from... -
BC Environmental Monitoring System (EMS)
The Environmental Monitoring System (EMS), is the Ministry of Environment corporate electronic repository for the capture and extraction of results for chemical, physical and... -
Davidson Project: Predicted Groundwater and Surface Water Chemistry Before, D...
This report illustrates and discusses the temporal trends in groundwater and surface water chemistry before, during, and after mining. It is based on empirical and predicted...