Water Quality in British Columbia Objectives Attainment
The setting of water quality objectives in priority basins in British Columbia began in 1982. By the end of 2002, the Ministry of Water, Land, and Air Protection had set water... -
Water Monitoring in British Columbia: Scanning the Data Landscape Public Report
The overall goal of this scan is to inform a shared vision for water monitoring and reporting in BC. This scan collected information on surface and groundwater quality and... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed... -
Telkwa Coal Project Appendix 6: Baseline Data, Surface Water, and Groundwater 1994
Samples were collected for the first time from a watercourse on the proposed project site on the north side of the Telkwa, and from sites on the Telkwa River and Goathorn Creek... -
Skeena Environmental Effects Monitoring (EEM) Pre-Design Reference Document
This document provides a basis for the design phase of an environmental effects monitoring program (EEM) for Repap's pulp and paper mill, Skeena Cellulose Inc., located near... -
Skeena Cellulose Inc. Environmental Effects Monitoring (EEM) Cycle Three...
The purpose of this design document is to summarize and update mill process information and results from previous cycles and other studies, and to provide a rationale for the... -
Review of the Environmental and Socio-Economic Impacts of Marine Pollution...
This report attempts to provide a preliminary review of the some of the possible impacts, monitoring, and mitigation measures for many of the pollution issues including sewage... -
Prince Rupert Area Coastal Fish Habitat Bibliography
A bibliography of existing coastal information describing habitat and biota. -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information... -
Morrison Copper/Gold Project Assessment Report
This Assessment Report considers the proposed Morrison Copper/Gold Mine Project’s potential to cause significant adverse environmental, economic, social, heritage, and health... -
Morice Water Management Area - Multi-Year Operational Plan
This operational plan is the initial product of a partnership between the Office of the Wet’suwet’en and the Province of British Columbia to develop a water monitoring and... -
Davidson Project: Application for Environmental Assessment Certificate
This underground mining project will be located in the Bulkley-Nechako Regional District and in the traditional territory of the Wet'suwet'en people. Included in this dataset... -
Canada's Policy for Conservation of Wild Pacific Salmon: Stream, Lake, and...
This report documents the methodology used by the Department of Fisheries and Oceans (DFO) to identify potential Strategy 2 habitat indicators, metrics, and benchmarks (as well... -
A Review of the Effects Assessment for the Morrison Copper/Gold Project
An assessment of the effects of the mine development on water flow, water quality and fish and aquatic resources has been carried out by the Proponent as part of its application... -
Environmental Impact Information of the Proposed Equity Mining Capital Ltd....
During 1974, Environment Canada undertook an additional study of the watershed adjacent to Equity Mining Capital Ltd.'s proposed development near Goosly Lake to supplement water...