-
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments... -
Telkwa Coal Project Appendix 8: Geotechnical and Hydrogeological...
Piteau Engineering Ltd. (PEL) was retained by Manalta Coal Ltd. (Manalta) to conduct a series of geotechnical and hydrogeological investigations in support of the proposed... -
Telkwa Coal Project Appendix 6: Baseline Data, Surface Water, and Groundwater 1994
Samples were collected for the first time from a watercourse on the proposed project site on the north side of the Telkwa, and from sites on the Telkwa River and Goathorn Creek... -
Telkwa Coal Project Appendix 12: Aquatic Resource Assessment 1985
Studies were undertaken during 1984 to evaluate aquatic resources in the Telkwa Project study area in west-central British Columbia. Stream periphyton, invertebrates, and fish... -
Natural Resource Stewardship Monitoring and Assessment Report for the...
Natural Resource Stewardship Monitoring and Assessment Reports are a summary of existing resource value monitoring and assessment information for a given geographic area. Data... -
Morrison Copper/Gold Application and Supporting Studies
This dataset contains elements of the Morrison Copper/Gold mine application which are relevant to salmon in the Skeena watershed. The document itself and its appendices... -
Morice Land and Resource Management Plan
The Morice LRMP provides policy direction on the management of land and resources in the Morice LRMP area, and provides direction for the establishment of landscape level legal... -
Fish Passage Assessment of Highway 16 and CN Rail in the Bulkley Watershed
This Bulkley fish passage assessment is part of a larger regional effort to improve fish passage limited by highways and secondary roads throughout the Skeena Basin. The purpose... -
Davidson Project: Application for Environmental Assessment Certificate
This underground mining project will be located in the Bulkley-Nechako Regional District and in the traditional territory of the Wet'suwet'en people. Included in this dataset... -
Davidson Project Description
Blue Pearl Mining is proposing to develop the Davidson deposit as an underground mine and to transport the ore off-site for processing. The Davidson deposit is situated a... -
Cumulative Effects of Planned Industrial Development and Climate Change on...
Here we employ a cumulative effects model to examine and compare the relative contribution of climate change and planned industrial development to cumulative effects in a... -
Bioassessment of Streams in North-Central British Columbia Using the...
This report outlines results from three years of RCA model development for the Skeena Region. It includes the development of standard methods for collecting and analyzing data... -
Environmental Impact Information of the Proposed Equity Mining Capital Ltd....
During 1974, Environment Canada undertook an additional study of the watershed adjacent to Equity Mining Capital Ltd.'s proposed development near Goosly Lake to supplement water...