12 datasets found

Tags: surface water Licenses: Other (Not Open) Categories and Collections: population Formats: PDF

Filter Results
  • Tenas Project: Project Description

    Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed metallurgical coal product at about 0.750 million saleable tonnes per year to be used in...
  • Telkwa Coal Project: Application for a Project Approval Certificate

    The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments proposed for British Columbia. The purpose of the Application is to provide an...
  • Radio Telemetry Studies of Summer Run Steelhead Trout in the Skeena River Dra...

    Radio tagging studies were carried out in the Skeena drainage in order to more fully understand the life history of summer run steelhead trout. During the fall of 1978, 24 steelhead were radio tagged on the Morice River, 15 on the Kispiox River, 14 on the...
  • Pacific Future Energy Refinery: Project Description

    This project description for the Pacific Future Energy refinery presents the purpose of the project, its location, and its building procedures. It also discusses how water will be used and treated, and the potential impacts on the surrounding environment....
  • Northwest Transmission Line: Bell-Irving Route Study

    Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information collected as well as an evaluation of potential project effects on VECs along the...
  • Morrison Copper/Gold Project Assessment Report

    This Assessment Report considers the proposed Morrison Copper/Gold Mine Project’s potential to cause significant adverse environmental, economic, social, heritage, and health effects. It identifies measures to prevent or reduce adverse effects, and sets out...
  • Morrison Copper/Gold Project 3rd Party Review Response Report

    This report presents the response to the 3rd Party Review of the Environmental Assessment for the Morrison Copper/Gold Project. The 3rd Party Review was requested by the Environmental Assessment Office and was mainly directed towards the hydrogeology, water...
  • Morice Water Management Area - Multi-Year Operational Plan

    This operational plan is the initial product of a partnership between the Office of the Wet’suwet’en and the Province of British Columbia to develop a water monitoring and assessment system for the recently established Morice Water Management Area (MWMA).
  • Kathlyn, Seymour, Round, and Tyhee Lakes: Water Quality Assessment and Object...

    This study quantifies the inputs of phosphorus from various sources and determines the extent to which additional phosphorus could be tolerated by each lake without a serious decrease in water quality. Based on this information, appropriate land uses and...
  • A Creel Survey of Helene Lake July, 1982

    This report summarizes the results of this creel census and provides details of age and growth of rainbow trout stocked in a barren lake.
  • 1999 Buck Creek Juvenile Salmonid Trapping Program

    In the spring of 1999, the Community Futures Development Corporation of Nadina (CFDCN) was contracted by Barry Finnegan, Northern Coho Stock Assessment Biologist of Fisheries and Oceans Canada, to operate a Rotary Screw Trap (RST) on Buck Creek in the Upper...
  • The Sockeye Salmon (Oncorhynchus nerka) of Morrison and Tahlo Lakes British C...

    The purpose of this literature review is to provide a compilation of the published sockeye salmon fish literature on Morrison and Tahlo Lakes with references where appropriate to the much more extensive literature on Babine Lake. The focus of the report...
You can also access this registry using the API (see API Docs).