1 dataset found

Licenses: Other (Not Open) Tags: 2010s bulkley river cumulative effects surface water

Filter Results
  • Tenas Project: Project Description

    Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed metallurgical coal product at about 0.750 million saleable tonnes per year to be used in...
You can also access this registry using the API (see API Docs).