Aquatic Resource Baseline Studies Telkwa Coal Project 1997 - Draft 2
Aquatic studies were conducted in the vicinity of the Telkwa Coal Project during 1997. These studies included updating baseline information describing the periphyton and benthic communities in Goathorn and Tenas creeks (Section 1), as well as studies of... -
Water Quality in the Toboggan Creek Watershed 1996-1998: Are Land Use Activit...
FO Habitat and Enhancement Branch initiated water quality monitoring in Toboggan Creek watershed in early 1996. Toboggan Creek is an important nursery stream for both wild and hatchery fish, primarily coho, pink, steelhead and Dolly Varden, with smaller... -
Water Quality Assessment and Objectives for Toboggan Creek and Tributaries: T...
The purpose of this report is to assess the water quality and aquatic ecosystem data gathered to date and to recommend water quality objectives specific to the Toboggan Creek watershed. Designated water uses, to be protected by water quality objectives, are... -
Water Management at Equity Silver Mines Ltd.
Predominantly all wastes, both tailing and blasted rock, contain pyrite and are classified acid generating. Acid generation occurs within waste rock fills around the property however not within tailing thus far due to sub- aqueous disposal of the product.... -
Upper Bulkley and Morice Water and Salmon Sustainability Views: Inventory of ...
In the Upper Bulkley and Morice basins of the Skeena watershed, climate change and human induced stresses are contributing to the degradation of aquatic resources, including salmon populations. It is apparent that collaborative efforts to better manage and... -
Upper Bulkley Floodplain Habitat: Modifications, Physical Barriers, and Sites...
The Bulkley River upstream of the Morice River has some of the most intense public and private land use in the Skeena watershed. The purpose of this assessment was to document human-induced modifications to floodplain habitat and river channelization,... -
The Skeena River Estuary Status of Environmental Knowledge to 1975: Report of...
This report compiles and summarizes knowledge on the Skeena River Estuary, providing useful background information for those concerned with environmental impacts of these and other contemplated developments. -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed metallurgical coal product at about 0.750 million saleable tonnes per year to be used in... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments proposed for British Columbia. The purpose of the Application is to provide an... -
Site-Specific Water Quality Guidelines for Skeena River at Usk for the Purpos...
Site-specific water quality guidelines for the Skeena River at Usk for the purpose of national reporting (May 2005). This document is one in a series that presents ambient site-specific water quality guidelines (SSGs) for British Columbia and the Yukon.... -
Review of the Environmental and Socio-Economic Impacts of Marine Pollution in...
This report attempts to provide a preliminary review of the some of the possible impacts, monitoring, and mitigation measures for many of the pollution issues including sewage and waste disposal, mining and smelter activities, various large industrial... -
Review and Assessment of Water Quality in the Skeena River Watershed, British...
Historical water quality data presented for the Skeena River watershed are divided into nine subsequent sections, corresponding to the nine major watershed reaches. Each section is divided into 6 subsections: hydrology, land use history, water withdrawals,... -
Reconnaissance Inventory of Jack Mould Lake (Alias)
Klohn-Crippen Consultants Ltd. was retained by the Fisheries Branch of the Ministry of Environment, Lands and Parks in Smithers, British Columbia, to conduct a reconnaissance survey of Jack Mould Lake (alias - Watershed Code unknown) which lies within the... -
Paleolimnological analyses of cultural eutrophication patterns in British Col...
Diatom-based paleolimnological approaches were used to determine the effects of cultural impacts on eutrophication histories in four lakes from central British Columbia. -
Natural Resource Stewardship Monitoring and Assessment Report for the Wet'suw...
Natural Resource Stewardship Monitoring and Assessment Reports are a summary of existing resource value monitoring and assessment information for a given geographic area. Data in this report has been arranged into the following categories: fish and water,... -
Morrison Copper/Gold Project Assessment Report
This Assessment Report considers the proposed Morrison Copper/Gold Mine Project’s potential to cause significant adverse environmental, economic, social, heritage, and health effects. It identifies measures to prevent or reduce adverse effects, and sets out... -
Morice-Nanika Sockeye Recovery Plan
The Morice-Nanika Sockeye Recovery Plan process provides a framework for aboriginal, government, industry, and public groups to work together towards stock recovery. -
Morice Watershed-Based Fish Sustainability Plan: A Plan to Conserve and Prote...
The purpose of the Morice Watershed-based Fish Sustainability Plan is to sustain robust fish populations and fully functioning aquatic ecosystems in the Morice River watershed. The goals of the plan are to: • Maintain and protect existing fish habitat; •... -
Morice Water Management Area - Multi-Year Operational Plan
This operational plan is the initial product of a partnership between the Office of the Wet’suwet’en and the Province of British Columbia to develop a water monitoring and assessment system for the recently established Morice Water Management Area (MWMA). -
Morice Land and Resource Management Plan
The Morice LRMP provides policy direction on the management of land and resources in the Morice LRMP area, and provides direction for the establishment of landscape level legal objectives. There are four main sections to the plan: General Management...