Northwest Cumulative Effects Case Study
The Northwest pilot has investigated a range of cumulative effect related topics as well as developed methods to assess impacts of industrial development on a selection of values at a broad spatial scale. The goal of the pilot was to improve the consistency... -
Assessment of the Impact of the Kemano II Proposal on the Fish and Wildlife R...
In 1974 and 1975, the Fish and Wildlife Branch conducted field studies on the fish and wildlife populations in the Nanika-Kidprice system which would be affected by the proposed Kemano II project. The field portion of these studies was funded by B.C. Hydro.... -
Wet'suwet'en Rights and Title and Enbridge's Northern Gateway Pipelines Project
The Office of the Wet'suwet'en (OW) presents this submission to the Northern Gateway Joint Review Panel. This submission is a component of the Wet'suwet'en response in respect of the proposed Northern Gateway project within Wet'suwet'en territory. The... -
Upper Bulkley River Coho Carcass Recovery Program: 2001
This carcass recovery program evaluated the feasibility of conducting carcass recovery on the spawning grounds in the Upper Bulkley River mainstem and tributaries. -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed metallurgical coal product at about 0.750 million saleable tonnes per year to be used in... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments proposed for British Columbia. The purpose of the Application is to provide an... -
Survey of Bulkley Lake and its Inlet and Outlet Streams
Recent reports of serious declines of the rainbow trout sport fishery in this region have created a need for information on the annual recruitment and relative species composition at these lakes. The most recent concern has been an outburst of beaver... -
Reconnaissance Inventory of West Julian Holland Lake
The report presents the results of a reconnaissance level “Fish and Fish Habitat Inventory” of West Julian Holland Lake 460-6006-508-005-283-218-502-01 performed to the current standards provided by the Resources Inventory Committee (RIC). West Julian... -
Reconnaissance Inventory of Damsumlo Lake
The Damsumlo Lake fish community was sampled with two standard experimental multi-mesh gillnets (one floating and one sinking) and five Gee-type minnow traps baited with salmon roe. Inlets and the outlet stream were sampled for fish presence by... -
Reconnaissance (1:20,000) Fish and Fish Habitat Inventory in the Upper Buck C...
This inventory provides information regarding the characteristics, distributions, and relative abundance of fish species, as well as information on biophysical lake and stream data. This information can be used for the interpretation of habitat sensitivity... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information collected as well as an evaluation of potential project effects on VECs along the... -
Natural Resource Stewardship Monitoring and Assessment Report for the Wet'suw...
Natural Resource Stewardship Monitoring and Assessment Reports are a summary of existing resource value monitoring and assessment information for a given geographic area. Data in this report has been arranged into the following categories: fish and water,... -
Morrison Copper/Gold Project Fish Habitat Compensation Plan
Pacific Brooker Minerals is proposing to develop the Morrison Copper/Gold Project on the east side of Morrison Lake, north of Babine Lake. The project will require the construction of a Tailings Storage Facility, including tailings and seepage control dams,... -
Morrison Copper/Gold Project Assessment Report
This Assessment Report considers the proposed Morrison Copper/Gold Mine Project’s potential to cause significant adverse environmental, economic, social, heritage, and health effects. It identifies measures to prevent or reduce adverse effects, and sets out... -
Morice Water Management Area - Multi-Year Operational Plan
This operational plan is the initial product of a partnership between the Office of the Wet’suwet’en and the Province of British Columbia to develop a water monitoring and assessment system for the recently established Morice Water Management Area (MWMA). -
Lakes of the Skeena River Drainage VI: The Lakes of the Upper Sustut River
This report summarizes the study of the lakes of the Upper Sustut River in 1946. Sustut Lake, Asitka Lake, Johanson Lake, Darb Lake, and Spawning lake were surveyed for fish presence and water temperatures were recorded. -
Kitsumkalum Traditional Use Study Interim Report for Pacific Northwest LNG/Pe...
This interim report summarizes the written literature on the Kitsumkalum First Nation in regards to their traditional land use practices within their traditional territory. However, a majority of authors have discussed the Tsimshian more generally and this... -
Kitimat - Summit Lake (KSL) Pipeline Looping Project: Project Description
This project description has been prepared for submission to the B.C. Environmental Assessment Office (EAO) in accordance with the requirements of the B.C. Environmental Assessment Act. This environmental assessment will consider the potential effects of... -
Effects of Beaver on Juvenile Coho Salmon Habitat in Kispiox River Tributaries
The purpose of this study was to collect data to determine how beaver dams might affect coho populations in tributaries of the Kispiox River, and to provide a review of the literature on the effects of beaver activity on salmonid populations. -
Babine River Interim Local Resource Use Plan
This plan describes the management consensus option and resource management issues for the Babine River area. It includes the watershed management prescriptions developed to meet the objectives of the consensus option.