28 datasets found

Groups: population Licenses: Other (Not Open) Tags: chinook sockeye water quality

Filter Results
  • Reconnaissance Level Fish and Fish Habitat Inventories in the Bulkley T.S.A.

    These reports summarize the reconnaissance level fish and fish habitat inventories for various locations along the Bulkley River. Sensitive habitats and barriers are discussed, and fish summary tables and images are provided for the creeks examined within...
  • Technical Data Reports for Enbridge Northern Gateway Project

    Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field surveys completed included sampling of fish species assemblages and habitat...
  • Northwest Cumulative Effects Case Study

    The Northwest pilot has investigated a range of cumulative effect related topics as well as developed methods to assess impacts of industrial development on a selection of values at a broad spatial scale. The goal of the pilot was to improve the consistency...
  • DFO Area 4 Annual Reports 1950 - 1972

    DFO Area 4 Annual Narrative Reports from 1950 to 1972. Reports include comments on spawning summaries (coho, sockeye, pink and chinook), commercial fisheries, sport fisheries, Indian Food fisheries, water levels, herring, pollution (chemical spills),...
  • DFO Area 4 Annual Reports 1918 - 1949

    Department of Fisheries and Oceans Area 4 Annual Reports from 1918 - 1949. Reports include comments on spawning summaries (coho, sockeye, pink and chinook), commercial fisheries, sport fisheries, Indian Food fisheries, water levels, herring, pollution...
  • Conserving Kispiox Fish Populations and their Habitat

    This report was prepared for the Kispiox Watershed-based Fish Sustainability Plan (KWFSP) planning table. It briefly describes the origin, purpose, and benefits of Watershed-based Fish Sustainability Planning (WFSP), a four-stage planning sequence that...
  • Wet'suwet'en Title & Rights and Coastal GasLink

    The Office of the Wet'suwet'en (OW) presents this submission to British Columbia Environmental Assessment Agency (BC EAO). This submission is a component of the Wet'suwet'en response in respect of the proposed Coastal GasLink pipeline project within...
  • Wet'suwet'en Submission to the Canadian Environmental Assessment Agency - Pac...

    This submission from the Office of the Wet'suwet'en (OW) to the Canadian Environmental Assessment Agency (CEAA) is a response to the CEAA report regarding the proposed Pacific NorthWest LNG project near LeLu Island.
  • Wet'suwet'en Rights and Title and Enbridge's Northern Gateway Pipelines Project

    The Office of the Wet'suwet'en (OW) presents this submission to the Northern Gateway Joint Review Panel. This submission is a component of the Wet'suwet'en response in respect of the proposed Northern Gateway project within Wet'suwet'en territory. The...
  • Tenas Project: Project Description

    Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed metallurgical coal product at about 0.750 million saleable tonnes per year to be used in...
  • Telkwa Coal Project: Application for a Project Approval Certificate

    The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments proposed for British Columbia. The purpose of the Application is to provide an...
  • Skeena Environmental Effects Monitoring (EEM) Pre-Design Reference Document

    This document provides a basis for the design phase of an environmental effects monitoring program (EEM) for Repap's pulp and paper mill, Skeena Cellulose Inc., located near Prince Rupert, British Columbia. The pre-design document is essentially a "State of...
  • Results of the Kloiya River Resistivity Counter

    The objective of this study was to quantify juvenile steelhead abundance and estimate values for habitat capacity thresholds. In 2005, the Ministry of Environment (MoE) began investigating the potential of using the Kloiya as an index stream for monitoring...
  • Preliminary Survey of Juvenile Salmonid Rearing Habitat Summer 1976: Upper Ki...

    A preliminary study of the juvenile salmonid populations of the Upper Kalum River and its tributaries was conducted during August 1976. The objectives of the study were: to locate and describe the preferred rearing habitat of juvenile salmonids in the Kalum...
  • Pacific Future Energy Refinery: Project Description

    This project description for the Pacific Future Energy refinery presents the purpose of the project, its location, and its building procedures. It also discusses how water will be used and treated, and the potential impacts on the surrounding environment....
  • Northwest Transmission Line: Bell-Irving Route Study

    Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information collected as well as an evaluation of potential project effects on VECs along the...
  • Natural Resource Stewardship Monitoring and Assessment Report for the Wet'suw...

    Natural Resource Stewardship Monitoring and Assessment Reports are a summary of existing resource value monitoring and assessment information for a given geographic area. Data in this report has been arranged into the following categories: fish and water,...
  • Morrison Copper/Gold Project Assessment Report

    This Assessment Report considers the proposed Morrison Copper/Gold Mine Project’s potential to cause significant adverse environmental, economic, social, heritage, and health effects. It identifies measures to prevent or reduce adverse effects, and sets out...
  • Morrison Copper/Gold Project 3rd Party Review Response Report

    This report presents the response to the 3rd Party Review of the Environmental Assessment for the Morrison Copper/Gold Project. The 3rd Party Review was requested by the Environmental Assessment Office and was mainly directed towards the hydrogeology, water...
  • Kitimat - Summit Lake (KSL) Pipeline Looping Project: Project Description

    This project description has been prepared for submission to the B.C. Environmental Assessment Office (EAO) in accordance with the requirements of the B.C. Environmental Assessment Act. This environmental assessment will consider the potential effects of...
You can also access this registry using the API (see API Docs).