Wet'suwet'en Rights and Title and Enbridge's Northern Gateway Pipelines Project
The Office of the Wet'suwet'en (OW) presents this submission to the Northern Gateway Joint Review Panel. This submission is a component of the Wet'suwet'en response in respect of the proposed Northern Gateway project within Wet'suwet'en territory. The... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed metallurgical coal product at about 0.750 million saleable tonnes per year to be used in... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments proposed for British Columbia. The purpose of the Application is to provide an... -
Reconnaissance Inventory of West Julian Holland Lake
The report presents the results of a reconnaissance level “Fish and Fish Habitat Inventory” of West Julian Holland Lake 460-6006-508-005-283-218-502-01 performed to the current standards provided by the Resources Inventory Committee (RIC). West Julian... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information collected as well as an evaluation of potential project effects on VECs along the... -
Natural Resource Stewardship Monitoring and Assessment Report for the Wet'suw...
Natural Resource Stewardship Monitoring and Assessment Reports are a summary of existing resource value monitoring and assessment information for a given geographic area. Data in this report has been arranged into the following categories: fish and water,... -
Lakes of the Skeena River Drainage VI: The Lakes of the Upper Sustut River
This report summarizes the study of the lakes of the Upper Sustut River in 1946. Sustut Lake, Asitka Lake, Johanson Lake, Darb Lake, and Spawning lake were surveyed for fish presence and water temperatures were recorded. -
Kitimat - Summit Lake (KSL) Pipeline Looping Project: Project Description
This project description has been prepared for submission to the B.C. Environmental Assessment Office (EAO) in accordance with the requirements of the B.C. Environmental Assessment Act. This environmental assessment will consider the potential effects of... -
Effects of Beaver on Juvenile Coho Salmon Habitat in Kispiox River Tributaries
The purpose of this study was to collect data to determine how beaver dams might affect coho populations in tributaries of the Kispiox River, and to provide a review of the literature on the effects of beaver activity on salmonid populations. -
A Reconnaissance Survey of Netalzul Meadow Lake (Alias)
Klohn-Crippen Consultants Ltd. was retained by the Fisheries Branch of the BC Ministry of Environment, Lands, and Parks in Smithers, British Columbia, to conduct a reconnaissance survey of Netalzul Meadow Lake (alias) within the Bulkley River watershed. The... -
1:5,000 Fish and Fish Habitat Inventory in the Kispiox Watershed
The objectives of this study were to conduct fish and fish habitat inventories, using 1:20,000 scale maps, to classify stream reaches within or adjacent to proposed timber harvesting areas as per Forest Practises Code regulations. The information in each...