-
Trout Creek/Moricetown Watershed Assessment Project
This document contains information on the Level I Sediment Source Assessment. The Consolidated Access Management Plan (AMP) and the Interior Watershed Assessment Program (IWAP)... -
Trout Creek/Kitseguecla Landscape Unit Plan
The Trout Creek Landscape Unit Plan (LUP) outlines the objectives and the strategies for the resource management of the Trout Creek and Toboggan watershed within the Bulkley... -
Tier I Watershed-level fish values monitoring protocol
This report provides a protocol for Tier 1 watershed-level fish monitoring based on remote-sensed or broad-scale habitat inventory data available for all watersheds in regularly... -
The Physical Limnology of Lakelse Lake, British Columbia
During the five years, 1944 to 1948, physical and chemical studies were conducted on Lakelse lake, B.C., as part of the programme of salmon research on the Skeena river.... -
The Distribution of Aquatic Vegetation in Lakelse Lake and the Partitioning...
This report was requested by the regional staff as part of a complete study on Lakelse Lake. There was a need to know the value of aquatic plants, for fish habitat, and their... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments... -
Telkwa Coal Project Appendix 8: Geotechnical and Hydrogeological...
Piteau Engineering Ltd. (PEL) was retained by Manalta Coal Ltd. (Manalta) to conduct a series of geotechnical and hydrogeological investigations in support of the proposed... -
Telkwa Coal Project Appendix 6: Baseline Data, Surface Water, and Groundwater 1994
Samples were collected for the first time from a watercourse on the proposed project site on the north side of the Telkwa, and from sites on the Telkwa River and Goathorn Creek... -
Telkwa Coal Project Appendix 12: Aquatic Resource Assessment 1985
Studies were undertaken during 1984 to evaluate aquatic resources in the Telkwa Project study area in west-central British Columbia. Stream periphyton, invertebrates, and fish... -
Sustaining Lakelse Lake
A brief summary and visual results to natural resources and perks in Lakelse Lake. -
Stream Inventory - Thautil River Watershed
An aquatic stream inventory was conducted in the Thautil River Watershed in the Morice Forest District during the summer and fall of 1996. This report presents an overview of... -
Skeena Steelhead Conservation Units
The purpose of this project is to provide an update of Skeena steelhead population structure that is more consistent with both the federal methodology and the intent of the wild... -
Skeena River Estuary Assessment Project
This project assessed key pressures on salmon habitat in the Skeena River estuary. The authors used benchmarks to assess the status of salmon habitat indicators and identified... -
Skeena Environmental Effects Monitoring (EEM) Pre-Design Reference Document
This document provides a basis for the design phase of an environmental effects monitoring program (EEM) for Repap's pulp and paper mill, Skeena Cellulose Inc., located near... -
Skeena Cellulose Inc. Environmental Effects Monitoring (EEM) Cycle Three...
The purpose of this design document is to summarize and update mill process information and results from previous cycles and other studies, and to provide a rationale for the... -
Seymour Lake: 1984 Data Summary and Recommendation
The 1984 sampling program for Seymour Lake was designed to provide nutrient loading data for the lake such that a management prescription for the lake and watershed management... -
Seymour Lake Rehabilitation Reconnaissance Report 1978
This purpose of this reconnaissance report is to provide further information on the proposed rehabilitation of Seymour Lake with special attention to potential problem areas and... -
Review of the Environmental and Socio-Economic Impacts of Marine Pollution...
This report attempts to provide a preliminary review of the some of the possible impacts, monitoring, and mitigation measures for many of the pollution issues including sewage... -
Results of the Upper Sustut River Weir Steelhead Assessment Projects
A floating PVC fish fence was installed into the upper Sustut River annually since 1992, as an indicator of annual upper Sustut River adult steelhead (Oncorhynchus mykiss)...