-
Westcoast Connector Gas Transmission Project: Conceptual Freshwater Fish...
This freshwater CFHOP outlines the strategy and framework for development of the Final Fish Habitat Offsetting Plan (FHOP). A marine CFHOP companion document has also been... -
West Babine Sustainable Resource Management Plan
This dataset contains the West Babine Sustainable Resource Management Plan and associated maps and spatial data. The West Babine Sustainable Resource Management Plan (SRMP) has... -
Water Quality in the Toboggan Creek Watershed 1996-1998: Are Land Use...
FO Habitat and Enhancement Branch initiated water quality monitoring in Toboggan Creek watershed in early 1996. Toboggan Creek is an important nursery stream for both wild and... -
Water Quality and Accumulation of Periphyton (attached algae) in the Bulkley...
In recent years, studies in the upper Bulkley River upstream of Houston have noted elevated levels of bacteria, nutrients and attached algae (periphyton). A 1992 fisheries study... -
Vopak Pacific Canada Project Description
The purpose of the Project is to provide berthing and loading facilities for bulk liquid cargo that will be received via the existing rail loop on Ridley Island. Due to the... -
Trout Creek/Kitseguecla Landscape Unit Plan
The Trout Creek Landscape Unit Plan (LUP) outlines the objectives and the strategies for the resource management of the Trout Creek and Toboggan watershed within the Bulkley... -
Timber Harvesting Practices and Mountain Goat Habitat Project 2007–3
Mountain goats have been identified as a monitoring priority for the Babine watershed Monitoring Trust (BWMT) for the last two years. In 2007, the BWMT initiated a background... -
The Socio-Economic Importance of Maintaining the Quality of Recreational...
This paper reports on a series of surveys conducted during the summer of 1973 to determine the economic and social value of Lakelse Lake to residents of British Columbia. The... -
The Morice WFSP-Planning Linkages and Forest Licensee Support
The objectives of this report are to provide: (1) a summary of the challenges and successes faced in integrating the Morice Watershed-based Fish Sustainability Plan (WFSP)... -
The Flooded Tailings Impoundment at the Equity Silver Mine
The Equity Silver Mine operated between 1980 and 1994, producing silver, gold, and copper from three open pits and a small underground operation. Mine components include a... -
The Babine River Watershed: An Annotated Bibliography of Inventory,...
This bibliography was completed to provide an information base to the Babine Watershed Monitoring Group. This group is being established to coordinate monitoring of resource... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed... -
Tenas Project Application Information Requirements 2022
The Application Information Requirements (AIR) specifies the information that Telkwa Coal Limited (the Proponent) is required to provide in their Application for an... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments... -
Telkwa Coal Project Appendix 8: Geotechnical and Hydrogeological...
Piteau Engineering Ltd. (PEL) was retained by Manalta Coal Ltd. (Manalta) to conduct a series of geotechnical and hydrogeological investigations in support of the proposed... -
Telkwa Coal Project Appendix 6: Baseline Data, Surface Water, and Groundwater 1994
Samples were collected for the first time from a watercourse on the proposed project site on the north side of the Telkwa, and from sites on the Telkwa River and Goathorn Creek... -
Telkwa Coal Project Appendix 12: Aquatic Resource Assessment 1985
Studies were undertaken during 1984 to evaluate aquatic resources in the Telkwa Project study area in west-central British Columbia. Stream periphyton, invertebrates, and fish... -
Technical and Management Proposal: Impact of Coal Dust on Marine Environment...
The report contains a concise summary report outlining the findings of this study on the potential impact of coal and coal contaminated sediments on marine life. -
Technical Data Report: Conceptual Freshwater Fish Habitat Compensation Plan...
The objectives of this plan are three-fold. First, the plan describes the methods that will be used to quantify the amount of compensatory fish habitat needed to offset the... -
Sustaining Lakelse Lake
A brief summary and visual results to natural resources and perks in Lakelse Lake.