Reconnaissance Geochemical Soil Survey and Reconnaissance Geological Survey...
The purpose of the reconnaissance geological survey was to determine whether the board band of favourable volcanic host rocks seen on the northwest section of the Topley... -
Rare Ecosystems of the Babine River Watershed
Our objective was to identify rare ecosystems in the watershed using existing data such as field reports, terrestrial ecosystem mapping projects, and predictive ecosystem... -
Range of Variation in Structural Attributes of Harvested Stands in the...
This report provides information on structure remaining following managed disturbance (timber harvesting) within the Babine River Watershed as a basis for direct comparisons... -
Rail Evacuation Maps
Railway evacuation maps for diesel, methanol, and propane referenced from the North American 2016 Emergency Response Guidebook -
Project Description Prince Rupert LNG
Prince Rupert LNG Limited (PRLNG) proposes to develop a Liquefied Natural Gas (LNG) facility on Ridley Island at the Port of Prince Rupert British Columbia (BC). The name of the... -
Prince Rupert Marine Risk Assessment
This study provides Prince Rupert Port Authority (PRPA) with an assessment of the risks due to future operations of LNG and oil tankers in the Prince Rupert gateway, to compare... -
Prince Rupert Area Coastal Fish Habitat Bibliography
A bibliography of existing coastal information describing habitat and biota. -
Potential Effects of an Oil Pipeline Rupture on Reach 2 of Morice River: A...
This submission focuses on a portion of the pipeline route that is located adjacent to Morice River, 70 km south of Smithers. It examines the implications of a pipeline rupture... -
Pacific Trail Pipelines Project: Volume 1 Report - Application for...
This Application for an Environmental Assessment Certificate for the KSL Project has been prepared pursuant to Section 16(1) of the B.C. Environmental Assessment Act. The... -
Pacific Trail Pipelines Project: Application to Amend Environmental...
This environmental assessment, like the effects assessment contained in the original 2007 EAC Application, is a sustainability-based environmental assessment that considers the... -
Pacific Trail Pipelines Project: Application No.4 to Amend Environmental...
This environmental effects assessment, like the effects assessment provided in the 2007 EAC Application, is a sustainability-based environmental assessment that considers five... -
Pacific Trail Pipelines Application Volume II: Baseline Studies
These baseline studies cover the following topics with regards to the impacts of the Pacific Trail Pipeline: acid rock drainage and metal leaching, acoustic environment, air... -
Pacific Northwest LNG: Project Description
Pacific NorthWest LNG Limited Partnership (PNW LNG) is proposing to construct and operate a liquefied natural gas (LNG) export facility within the District of Port Edward,... -
Pacific Northern Gas Looping Project: Project Description
This report summarizes the Pacific Northern Gas Looping Project by describing the project, areas of federal interest, the resource and material requirements, indigenous... -
Pacific North Coast Integrated Management Area Plan
The Pacific North Coast Integrated Management Area ( PNCIMA ) is one of five national Large Ocean Management Areas identified in Canada’s 2005 Oceans Action Plan. The plan... -
Pacific Future Energy Refinery: Project Description
This project description for the Pacific Future Energy refinery presents the purpose of the project, its location, and its building procedures. It also discusses how water will... -
Our Place at the Table: First Nations in the B.C. Fishery
This report lays out solutions and recommendations aimed at bringing a high degree of certainty to aboriginal and non-aboriginal interests alike while ensuring the conservation... -
Options for the Babine River Area
Land management strategies and access route options for the Babine River planning area. -
Old Growth Deferral Areas
In November 2021, the BC Old Growth Technical Advisory Panel released eight maps outlining the most at risk old forest for immediate deferral. This dataset includes the... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information...