Volume IX - Appendix 27: Morrison Copper/Gold...
The information contained in this baseline is intended to support a full environmental and socio-economic impact assessment of the Project. This report presents the results of field studies conducted in 2008 on the water quality, sediment quality, as well as the primary and secondary producer communities in the Morrison Copper/Gold Project area. The objectives of this assessment were to determine the baseline conditions (adding to the data previously collected in 2006 and 2007) and characterize aquatic ecosystems in the proposed mine site receiving environment and along the proposed power transmission line.
Thông tin khác
Miền | Giá trị |
---|---|
Data last updated | 12 tháng 4, 2019 |
Metadata last updated | 30 tháng 6, 2022 |
Được tạo ra | 12 tháng 4, 2019 |
Định dạng | |
Giấy phép | License not specified |
Datastore active | False |
Datastore contains all records of source file | False |
Has views | True |
Id | 3266a771-0c64-4a1f-ab5b-b6640f698755 |
Mimetype | application/pdf |
Package id | faf88cf9-6e8f-4294-abcc-038a53438686 |
Position | 12 |
State | active |
Url type | upload |