Kalum South Literature Compilation and Database
In order to identify the existing Watershed Restoration program (WRP) grey literature in the Kalum forest district, The Terrace/Kitimat Partners for Salmonid (TKPS) contracted... -
Ecosystem Restoration and Compliance Monitoring Program 2002-2003
The report presents the result from routine effectiveness evaluations conducted before 2003. -
Killutsal Creek Rearing Pond Enhancement
Lakelse lake is a prized recreational area both locally and regionally. Many small and large creeks enter the river along its 14-km length and fish values in these creeks are... -
Copper River Watershed Restoration Program: Copper River 3Km Off-channel Site
One project aim was the improvement of fish habitat. The site is located adjacent to the Copper River forest services road, between km 2 and 3, approximately 10 km east of... -
Fish Use Monitoring and Evaluation of Three Constructed Ponds within the...
This dataset contains a report evaluation the status of three constructed ponds in the Kalum Forest District. The ponds were constructed at Copper River 3 Km Off-channel Site,... -
Bushman Creek In-stream Maintenance Works
This document provides insight on the Bushman Creek In-Stream Maintenance Works, targeting the maintenance and repair of approximately 350m of channel extending upstream from... -
Juvenile Coho Studies at the Telkwa River Ponds
The purpose of these studies is to undertake coho smolt enumeration at Km 1010 and 1011 in the Bulkley River, to compare mark-and-recapture population estimates, and to measure... -
Fish Passage Culvert Inspections
This project was implemented to assess fish passage at culvert-bearing stream crossings. These assessments were carried out at culvert crossings installed on fish-bearing... -
Spawning Channel / Improved Spawning Habitat Project
This reports outlines the progress on four proposed projects in the Lakelse watershed in 2008/09 intended to improve spawning and incubation habitat for declining sockeye... -
Compilation of Stock Assessment Information for Skeena River Steelhead:...
Geographic information from the BC Watershed Atlas and juvenile steelhead surveys from the Sustut, Kispiox, Bulkley, and Upper Skeena rivers were used to update a model of... -
Toboggan Creek Hatchery Annual Reports
The Toboggan Creek Hatchery attempts to preserve and enhance the stocks of Coho and Chinook salmon populations in the Bulkley-Morice drainages. This dataset includes annual... -
Babine Watershed Monitoring Trust (BWMT) Framework
Includes Annual Framework Monitoring Plans as well as Trust Agreement in the form of a user manual and a summary. -
CN Trestle Bridge Channel Diversion and Revegetation
A failing slope was discovered below CN's Trestle Bridge at 8.8 mile on the CN Kitimat Subdivision, located approx. 10 km south of Terrace, BC. The unnamed creek (referred to as... -
Exchamsiks Backchannel Rehabilitation 2008
The Exchamsiks Backchannel area was recognized as having tremendous potential to provide necessary juvenile salmonid habitat in the lower Skeena River. The project focused on... -
Kumealon Creek Instream Construction
Two instream rehabilitation projects were implemented in Kumealon Creek, located 56 km south of Prince Rupert. The site is only accessible by boat or air. The creek has high... -
Scully Creek Off-channel Habitat & Flow Augmentation Project (N06-H11)
This report discusses the Scully Creek Off-channel Habitat and Flow Augmentation Project (N06-H11), which was initiated to improve sockeye spawning conditions that have been... -
Toboggan Creek Stream Rehabilitation and Silvern Lakes Road Deactivation
The objectives of this project are to re-establish and maintain the original stream channel, protect fish habitat, maintain fish passage and maintain 4wheel drive recreational... -
Nilkitkwa River Fish Passage Restoration
Assessment found that a pre-code fish crossing on an unnamed stream in the Nilkitkwa river watershed acted as a partial barrier to juvenile fish passage upstream due to high... -
Copper River Watershed Restoration Program: Debris Catcher Construction
Goals of the project included the improvement of fish habitat and educational purposes such as showing debris catchers as alternatives to traditional riprap bank protection for... -
Copper River Watershed Restoration Program: Site 9 Berm Removal & 3km Side Channel
Site 9 is a 300 m long groundwater channel that was excavated in 1998 within a flood channel to the Copper River, adjacent to 3 km along the Copper Forest Service Road. This...
Ви можете отримати доступ до цього реєстру через API (see Документація API).