2000-2001 Interim Watershed Restoration Plan - Lake District
There is no description for this dataset
-
Maxan Watershed Stream Habitat Restoration Works 1998/99
This report included Habitat Restoration Prescriptions for 12 sites on the Bulkley River, 2 sites on Foxy Creek, and 1 site on lower Maxan Creek. -
Interim Interior Watershed Restoration Plans
The following document is a compendium of the five Interim Interior Watershed Restoration Plans completed to date. -
Toboggan Creek Stream Rehabilitation and Silvern Lakes Road Deactivation
The objectives of this project are to re-establish and maintain the original stream channel, protect fish habitat, maintain fish passage and maintain 4wheel drive recreational... -
Bulkley River Pipeline Crossing - Fish Habitat Assessment
This report informs about the assessment of the aquatic habitat in the area of the proposed pipeline crossing, conducted in 1997. -
Bulkley River Bank Stabilization and Riparian Rehabilitation - Telkwa
The project was conducted on a privately owned site (Wittwer Ranch) around 4km upstream from Telkwa, northern BC. The goal of the Bulkley River Bank Stabilization and Riparian... -
Waterfall Creek Enhancement Project 2000
A restoration/rehabilitation plan was developed that recommended and initiated measures to address community concerns by supplying survey and design for rehabilitation work,... -
Cranberry and Kitwanga Rivers Fish Passage Inspection and Restoration projects
A series of 5 studies on the Kitwanga & Cranberry rivers pertaining to fish passage crossings and water quality evaluations. The first four studies were focused on... -
Upper Bulkley River Riparian Restoration
In effort to ameliorate riparian vegetation and reduce streambank erosion on the Upper Bulkley River, Maxan Creek and Richfield Creek, willow cuttings were planted and... -
McDowell Creek Culvert Replacement
This project focused on the replacement of a defunct culvert, that blocked fish access to 450 metres of important off-channel rearing habitat, approximately 130 metres upstream... -
Robert Hatch Creek Bridge Removal
This project focused on the removal of an old, collapsed wooden bridge where the creek passed through the Hatch Creek Ranch. Removal of this barrier and the restoration of... -
Richfield Creek Riparian Exclusion Fencing and Restoration
Richfield Creek was included in a larger riparian restoration initiative in 2021 through the Morice Water Monitoring Trust (see dataset: Upper Bulkley Riparian Restoration). The... -
Upper Bulkley Coho Spawner Reports
This series of reports includes coho salmon spawner data collected through spawner surveys, broodstock capture and beaver dam management actions in the Upper Bulkley River and... -
As-built Report of Fish Passage Improvement Projects within the Wet'suwet'en...
This report describes the fish passage restoration projects completed at three high-priority sites on the upper Bulkley River within Wet'suwet'en First Nation territory in 2017.... -
As-built Report of Aquatic Restoration and On-farm Cattle Management...
This report describes the as-built aquatic habitat restoration projects undertaken at four high-priority sites along the upper Bulkley River within Wet'suwet'en First Nation... -
As-built Report of Aquatic Restoration and On-farm Cattle Management...
This report describes the aquatic habitat restoration construction completed at the lower Craker Road site and repairs completed to two instream structures within the upper... -
Bulkley River and Morice River Watershed Groups Fish Passage Restoration Planning
In April of 2020, the Society for Ecosystem Restoration Northern British Columbia (SERNbc) undertook an initiative to plan and conduct fish passage restoration planning... -
Bulkley/Fulton Watershed Fish Passage Culvert Assessment Program
This study looks at barriers to fish crossings in the Bulkley-Fulton watershed, including forestry roads and poorly situated culverts. Funding was made available to restore fish... -
Drone monitoring of Maxan Creek restoration sites
Drone images (Ortho, DSM, DEM) for effectiveness monitoring of a site on Maxan Creek in May 2022 that underwent streambank stabilization in the fall of 2021.