-
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed... -
Resource Development in the Upper Zymoetz River Catchment 1995
This report addresses issues concerning the Class I angling water designation of the Zymoetz River. Attributes associated with the Zymoetz River's Class I angling water... -
Impacts of the Mountain Pine Beetle in the Babine River Ecosystem Network
The primary objective of this study is to determine if the Babine Watershed ecosystem network is effective in maintaining biodiversity in the face of climate-induced disturbance...