-
Vopak Pacific Canada Project Description
The purpose of the Project is to provide berthing and loading facilities for bulk liquid cargo that will be received via the existing rail loop on Ridley Island. Due to the... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments... -
Riparian and In-Stream Assessment of the Bulkley River System: An...
Sixty-eight tributaries to the Bulkley River were examined by topographic maps and air photo interpretation to assess the degree and nature of the impacts on these streams by... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information... -
Manuscript Report Series No. 1345: Intertidal Biota and Preliminary...
This report provides visual observations and details of sampling locations for the cruises. The detailed information resulting from the work will be presented in future... -
Interim Assessment Protocol for Aquatic Ecosystems in British Columbia:...
The Aquatic Ecosystems assessment protocol currently describes the derivation of a core set of watershed indicators that can be calculated consistently across the province using... -
Bioassessment of Streams in North Central British Columbia Using the...
In this project, a bioassessment tool known as the Reference Condition Approach (RCA) was developed for north-central British Columbia. In the RCA, benthic invertebrates and...